General Accelerators: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 7: Line 7:
=Maintenance=
=Maintenance=


A lot of tools need maintaining.
Second mill needs to be fixed.
Lathe needs to get operational.
Surface grinder needs to get dressed.
First mill needs to be lubricated. 3/4" dia collet mounting problem needs to be fixed.
Bandsaw needs cutting fluid refill.
=Inventory=
Standard stock of fasteners needs to be ordered and organized.
Stock of hydraulic hoses and fittings needs ordering and organizing.
Stock of electronic components needs ordering and organizing.


=Sourcing=
=Sourcing=


See [[Suppliers]]
See [[Suppliers]]

Revision as of 21:22, 22 December 2012

Tech Development

Organization

Workshop needs a lot of organization. 100 hours should get it to a much more workable state.

Maintenance

A lot of tools need maintaining.

Second mill needs to be fixed.

Lathe needs to get operational.

Surface grinder needs to get dressed.

First mill needs to be lubricated. 3/4" dia collet mounting problem needs to be fixed.

Bandsaw needs cutting fluid refill.

Inventory

Standard stock of fasteners needs to be ordered and organized.

Stock of hydraulic hoses and fittings needs ordering and organizing.

Stock of electronic components needs ordering and organizing.

Sourcing

See Suppliers