General Accelerators: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 18: | Line 18: | ||
Bandsaw needs cutting fluid refill. | Bandsaw needs cutting fluid refill. | ||
Problematic welders need troubleshooting and repair. | |||
=Inventory= | =Inventory= |
Revision as of 21:24, 22 December 2012
Tech Development |
---|
Organization
Workshop needs a lot of organization. 100 hours should get it to a much more workable state.
Maintenance
A lot of tools need maintaining.
Second mill needs to be fixed.
Lathe needs to get operational.
Surface grinder needs to get dressed.
First mill needs to be lubricated. 3/4" dia collet mounting problem needs to be fixed.
Bandsaw needs cutting fluid refill.
Problematic welders need troubleshooting and repair.
Inventory
Standard stock of fasteners needs to be ordered and organized.
Stock of hydraulic hoses and fittings needs ordering and organizing.
Stock of electronic components needs ordering and organizing.