*We are going to be limited by how many people are here to build. (Inga, Marcin, Jeremy, Guy)
*We are going to be limited by how many people are here to build. (Inga, Marcin, Jeremy, Guy)
*Marcin will be required to run the tractor and CEB press.
*Marcin will be required to run the tractor and CEB press.
*Bricks are 12 inches long by 6 inches wide by 4 inches high and weigh about 12 pounds (estimated).
*A 6 foot high section of wall will take 18 stacks of bricks.
*A 10 foot long row takes 20 bricks.
*A 10 foot long by 6 foot high wall section will take 360 bricks, and will weigh about 4320 pounds.


Possibilities:
Possibilities:

Revision as of 19:40, 7 June 2009

Ben

If the structure is a square base, then the roof is easiest as a half cylinder vault. If the structure is round, then a dome is easier.

Jeremy

Goals: Our goals are to build a quality house at eFarm using as many local materials as possible.


Specifications:

  • We are going to have an automatic CEB press.
  • We have a limited amount of time to build. (July 25 to August 22)
  • We are going to be limited by how many people are here to build. (Inga, Marcin, Jeremy, Guy)
  • Marcin will be required to run the tractor and CEB press.
  • Bricks are 12 inches long by 6 inches wide by 4 inches high and weigh about 12 pounds (estimated).
  • A 6 foot high section of wall will take 18 stacks of bricks.
  • A 10 foot long row takes 20 bricks.
  • A 10 foot long by 6 foot high wall section will take 360 bricks, and will weigh about 4320 pounds.

Possibilities:

  • Insulation:
    • Foam insulation.
    • Multi-layers of bricks.
  • Roof:
    • Vault
      • For a square building
    • Dome
      • For a round building

From constructing the CEB workshop:

  • Square brick designs are more stable (interlocking corner bricks) and easier to make it vertical.
  • Round sections are more difficult to do and harder to make vertical. One of the curved/angled wall sections was made with substandard frozen mortar material and it collapsed when the mortar thawed.