Fri Oct 11, 2013

Thurs Oct 10, 2013

Wed Oct 9, 2013

Tues Oct 8, 2013

Redid the Sketchup design of the backhoe pivot to match our paper model. Also added bolts to the design. I don't believe I uploaded the design to the wiki, but I sent it to Dan and the design has since been added to and is on the backhoe wiki page.

Screen Shot 2013-10-09 at 6.28.28 PM.png

Mon Oct 7, 2013

This morning we had a team meeting and went over plans to work on the backhoe design. I have been assigned the task of creating a tech tree of choices in order to lay out the various possible designs we might try. Below I'm going to upload a screenshot of what seems to be the industry standard backhoe pivot. We are using a site called coggle to do the mind map for the tech tree and you have to have the picture hosted somewhere else in order to have it be full size.

Screen Shot 2013-10-07 at 12.12.40 PM.png

Here is a shot showing the piston mounted at a much wider angle using the laser cutout model

Backhoe laser cutout 2.jpg


Sun Oct 6, 2013

This evening I shared the Backhoe sketchup files with several of my mechanical engineering friends with the hope that they might be able to come up with a simple solution for achieving a 180 degree range of left/right movement. Several agreed to take a look, hopefully they come up with something good. Meanwhile Dan Emmit and I are playing around with the laser cutout model...


Sat Oct 5, 2013

Starting this log. Should have created it earlier to keep track of progress on the microhouse build that started 9/28. That being said here are some of the images and content from the build.

2013-10-01 12.30.38.jpg

Northwest corner of the microhouse going up

2013-10-01 17.26.21-1.jpg

Lucas laying down the 15th (out of 16) CEB course

Spacer for measuring plumbing angles.jpg

A big of improvisation Chris and I made in order to check the fall of the sewage drainage pipes. I believe the fall needed to be 1 inch down (y axis) for every 4 inches of distance (x axis). We attached these two small pieces of plywood to a level.

2013-09-27 13.13.05.jpg

Chris working on the plumbing. You can just make out the strings we laid out in order to make sure the pipes came up in the correct place.

2013-09-28 17.17.18.jpg

Chris working on the utility module. This was one of the most complicated aspects of the microhouse

2013-09-28 17.17.43.jpg

Table containing various plumbing, electrical and fixture pieces.

2013-09-30 14.38.34.jpg

CEB brick floor being laid out over sand.