Power Cube 6/Research Development

From Open Source Ecology
< Power Cube 6
Revision as of 19:57, 24 February 2014 by Danny Epperson (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Design Requirements - Dream Checklist

  • O-level access parts replaceability for all parts
  • Exhaust must be kept away from hoses
  • Muffler must be dismountable by itself
  • Control panel does not interfere with hose attachment
  • Control panel has screw-down terminals or spade terminals for easy attachment of wires
  • Return line does not splash out the breather
  • Gas filling is readily accessible
  • Gas filling is readily accessible with 2 vertically-stacked power cubes
  • Engine does not stick out the top


Manuals