CEB Press/Manufacturing Instructions/Arms - primary
Jump to navigation
Jump to search
Main > Housing and construction > CEB Press > CEB press building instructions
Tools Required
Hole punch with 13/16" and 3/4" dyes
Materials Required
- 2 pieces 72" long - 4"x6"x3/8" angle steel
Diagrams
Fabrication Steps
Punch the 3/4" holes and then the 13/16" holes.
The holes are all to be punched in the 4" side of the angle iron, in 1 1/4" from the edge of it. The 3/4" holes are located 2" and 70" from one end of the angle iron. The two arms will be mirror images of one another.
The 13/16" hole centers are located at 15, 31, 37, 39 5/8, 48 3/8, 53, and 64" from one end of the angle iron. The outer ones (2" and 70") should be 3/4". (This is so that there is no play allowed between the primary and secondary arms). Make the two arms mirror images of one another.