Mike Log

From Open Source Ecology
Jump to navigation Jump to search

Notes on My OSE Objectives

  • I'm currently onsite at FeF!
  • My goal is to help get all the CAD models and drawings out by December 25th

November 16, 2011 - Wednesday

  • Good day of CAD yesterday. Looks like I'll be helping on the line today though stacking bricks. Marcin's going to try and have both CEB Presses running.
  • Looking for input on ARAS (aras.com) as an open source PLM software. If you have any advice or experience with it, please e-mail me! (mike dot apostol at gmail dot com)
  • After discussions with Marcin this morning, I'm going to create two versions of the CEB press. One as it is now with a list of bugs (but it has at least been fabricated) as a "beta" release and another version with some of the design improvements I have for it that will in all likelihood work but have not been actually tried out so can't really release it as a public release. It can be up to the fabricator which one they would like to use.
  • I really wish we were modeling in metric...soon...soon....

November 14, 2011 - Monday

  • Further progress on the Liberator CEB Press today. Got a really nice parametric model of the hopper so that we can dynamically change all the angles and sides so that we can optimize the shape and size.
  • I'm modeling most of the press as it is now that is prototyped, but am hopefully implementing a change to close off the gaps between the hopper and the soil loading drawer as well as clean up some of the hole locations and fits.
  • Hopefully recruiting some CAD help for the drawings soon!
  • [1] This technique works well, just caught my first fly by hand today with it hahah