Marcin ose YouTube Video Content
Jump to navigation
Jump to search
This is an index of videos which may be used to supplement remote video editing.
Construction 2011
- Transit use during HabLab construction - with John Marlatt, carpenter - [1]
- Towards HabLab roof - [2] - with Floyd Hagerman; discuss steps and time required for putting on roof
- Bulldozing construction site for HabLab - [3]
LifeTrac Tractor
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [4]
- LifeTrac Walkthrough (15 Mar 2009), 15 Mar 2009 - [5]
- more LifeTrac detail, 18 Mar 2009 - [6]
- Augering Post and Planting Holes, 28 Apr 2009 - [7]
- Loader Arms Adjustment, 11 Jun 2009 - [8]
- Lifetrac Drive, 16 Apr 2011 - [9]
- LifeTrack III, 16 Apr 2011 - [10]
- Bending of Tracks for Tractor, 27 Aug 2011 - [11]
- Lifetrac Erging from Cave, 7 Sep 2011 - [12]
- LifeTrac Trimmed in Half, 11 Sep 2011 - [13]
- Lifetrac to Bobcat Conversion Plate, 12 Sep 2011 - [14]
- Midnight oil episode: lifetrac shipping, 26 Sep 2011 - [15]
- Documenting Lifetrac with Ian, 26 Sep 2011 - [16]
- How to get Lifetrac up?, 27 Sep 2011 - [17]
- Loading Lifetrac, 27 Sep 2011 - [18]
- Chaining Lifetrac up, 27 Sep 2011 - [19]
- Lifetrac up!, 27 Sep 2011 - [20]
- Lifetrac on trailer, 27 Sep 2011 - [21]
- Ready to ship, 27 Sep 2011 - [22]
- Lifetrac control valves, 27 Sep 2011 - [23]
- LifeTrac Power Cube chokes, 27 Sep 2011 - [24]
- LifeTrac shipping off, 27 Sep 2011 - [25]
- Industry standard bulldozer, 28 Sep 2011 - [26]
- Welding Lifetrac tracks, 3 Oct 2011 - [29]
- Lifetrac Tracks design and jig comments, 3 Oct 2011 - [30]
- Filling Tractor 2 with hydraulic fluid, 4 Oct 2011 - [31]
- Motor control valve plumbing, 7 Oct 2011 - [32]
- First FeF Hydraulic Hack, 7 Oct 2011 - [33]
- Lifetrac 3 tracks, 10 Oct 2011 - [34]
- Welding remaining mufflers, 15 Oct 2011 - [35]
- Welding lifetarac mufflers, 15 Oct 2011 - [36]
- Lifetrac motor coupler failure, 15 Oct 2011 - [37]
- Power cube tabs connecting to tractor, 15 Oct 2011 - [38]
- Bobcat to Lifetrac conversion plate, 20 Oct 2011 - [39]
- Lifetrac shaft coupler, 21 Oct 2011 - [40]
- Bobcat hydraulics conversion, 21 Oct 2011 - [41]
- Bobcatto Lifetrac hydraulics step 2, 21 Oct 2011 - [42]
- Step 3, 21 Oct 2011 - [43]
- Step 4, 21 Oct 2011 - [44]
- Step 5, 21 Oct 2011 - [45]
- Step 6, 21 Oct 2011 - [46]
- Step 7, 21 Oct 2011 - [47]
- Step 8, 21 Oct 2011 - [48]
- Step 8.5, 21 Oct 2011 - [49]
- Step 9, 21 Oct 2011 - [50]
- Part 10, 21 Oct 2011 - [51]
- Pressure relief setting, 22 Oct 2011 - [52]
- Case drain returns on tractor, 22 Oct 2011 - [53]
- Power cube power and return, 22 Oct 2011 - [54]
- Prototype 1 loader mounted cement mixer 2, 11 Nov 2011 - [55]
- Prototype 1 loader mounted cement mixer, 11 Nov 2011 - [56]
---
- Power beyond port - hack - [57]
CEB
- CEB Cyclinder Testing, 5 Nov 2007 - [58]
- CEB Cylinder Mounting, 26 Nov 2007 - [59]
- CEB Testing with Hopper, 26 Dec 2007 - [60]
- Advanced Compressed Earth Block Press Fabrication, 18 Jan 2008 - [61]
- CEB Cylinder Mounting Assembly Preparation, 18 Jan 2008 - [62]
- CEB Press Plate Box, 18 Jan 2008 - [63]
- Compressed Earth Block Press Press Plate Testing, 18 Jan 2008 - [64]
- CEB Cylinder Mounting in Frame, 18 Jan 2008 - [65]
- First Completed CEB Prototype Testing, 18 Jan 2008 - [66]
- First CEB Block Ejected, 18 Jan 2008 - [67]
- Factor e Live 8, Advanced CEB Press and Solar Panels, 3 Sep 2008 - [68]
- (Factor e Live 10) CEB Field Testing, 16 Oct 2008 - [69]
- Open Source CEB Press Production Test Runs, 5 Nov 2008 - [70]
- CEB Brick Production Day 1, 9 Nov 2008 - [71]
- 5000 Compressed Earth Bricks Pressed, 25 Nov 2008 - [72]
- CEB field report - 5691 bricks pressed, 27 Nov 2008 - [73]
- Populating the CEB addition, 29 Nov 2008 - [74]
- CEB Plan B - Snow flurries, 30 Nov 2008 - [75]
- First CEB Brick Laid, 2 Dec 2008 - [76]
- First CEB Wall Section, 3 Dec 2008 - [77]
- CEB Wall Growing, 8 Dec 2008 - [78]
- Mounting the trusses on the CEB building, 11 Dec 2008 - [79]
- CEB Addition Near Completion, 19 Dec 2008 - [80]
- Factor e Live Distillations (part 5) The CEB Story - To Build a Village, 16 Jan 2009 - [81]
- CEB, Hexacube, and Hexayurt, 23 Feb 2009 - [82]
- Green Roof, 26 Feb 2009 - [83]
- CEB Hopper Problem Statement, 26 Feb 2009 - [84]
- Hexacube 2, 5 Mar 2009 - [85]
- Liberator 2 function, 12 Apr 2009 - [86]
- CEB controller testing with secondary cylinder, 18/12/11 - [87]
- CEB Controller 2011, 27 Aug 2011 - [88]
- Compression Chamber Quality Control, 1 Sep 2011 - [89]
- CEB Hoppers, 6 Sep 2011 - [90]
- Finising CEB Hoppers, 7 Sep 2011 - [91]
- CEB Secondary Cylinder hydraulic Connection, 10 Sep 2011 - [92]
- CEB needle valve, 19 Sep 2011 - [93]
- Main CEB cylinder testing, 19 Sep 2011 - [94]
- Full CEB Automation with Detroit Fab Lab Solenoid Drivers, 19 Sep 2011 - [95]
- Speed control needle valve, 23 Sep 2011 - [96]
- Ceb column foundation rebar, 24 Sep 2011 - [97]
- CEB vault prototype, 28 Sep 2011 - [98]
- 1 Squaring CEB Drawer, 2 Oct 2011 - [99]
- 2 frame jig, 2 Oct 2011 - [100]
- 3 fitting cylinder, 2 Oct 2011 - [101]
- 4 frame and roller guide holes, 2 Oct 2011 - [102]
- 5 frame jig turning, 3 Oct 2011 - [103]
- 6 frame welding, 3 Oct 2011 - [104]
- 7 making bolts, 3 Oct 2011 - [105]
- 8 shims squaring drawer, 3 Oct 2011 - [106]
- 9 squaring hyd cylinder, 3 Oct 2011 - [107]
- 10 stretching the frame, 3 Oct 2011 - [108]
- 11 torching sensor holes, 3 Oct 2011 - [109]
- Controller wiring 1, 7 Oct 2011 - [110]
- Controller wiring 2&3, 7 Oct 2011 - [111]
- Controller wiring 4, 7 Oct 2011 - [112]
- Controller 5, 7 Oct 2011 - [113]
- Controller 6, 7 Oct 2011 - [114]
- CEB finishing, 7 Oct 2011 - [115]
- Placing CEB press in position, 20 Oct 2011 - [116]
- Foundation plus positioning CEB in place, 21 Oct 2011 - [117]
- outer members, 21 Oct 2011 - [118]
- installing drawers, 22 Oct 2011 - [119]
- properly installed drawers, 22 Oct 2011 - [120]
- CEB Pressing setup, 22 Oct 2011 - [121]
- Brick pressing under way, 27 Oct 2011 - [122]
- Pressing - grate, 27 Oct 2011 - [123]
- CEB microcontroller repair, 28 Oct 2011 - [124]
- Solenoid driver replacement, 28 Oct 2011 - [125]
- Saturday the 29th pressing, 29 Oct 2011 - [126]
- CEB slurry preparation, 4 Nov 2011 - [127]
- Nov 12 pressing, 12 Nov 2011 - [128]
- Bridging, 12 Nov 2011 - [129]
- Meeting of the CEB presses, 12 Nov 2011 - [130]
- Powell machine, 12 Nov 2011 - [131]
---
- roller setup - [132]
- Grate modification - [133]
- Reinforcing compression chamber - [134]
- Shaker in action - [135]
- Controller board etching playlist - [136]
Solar
- Solar Panel Construction 1, 21 Jul 2008 - [137]
- Solar Panel Construction 2, 21 Jul 2008 - [138]
- Solar Panel Construction 3, 21 Jul 2008 - [139]
- Factor e Live 8, Advanced CEB Press and Solar Panels, 3 Sep 2008 - [140]
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [141]
Digging
- Rotary Hydraulic Well Digging, 3 Apr 2008 - [142]
- Digging a Well Part 2, 6 Aug 2008 - [143]
- Augering Post and Planting Holes, 28 Apr 2009 - [144]
Rototiller/Soil Pulverizer
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [145]
- Soil pulverizer prototype 3, 22 Sep 2011 - [146]
- Pulverizer stop angle mod, 22 Sep 2011 - [147]
- Soil Pulverizer prototype 3 complete, 23 Sep 2011 - [148]
- Soil Pulverizer prototype 3 welding, 23 Sep 2011 - [149]
- Loading soil Pulverizer - mower, 3 Oct 2011 - [150]
- Soil Pulverizer prototype 3, 8 Oct 2011 - [151]
- Bobcat meets pulverizer, 20 Oct 2011 - [152]
- Soil Pulverizer on bobcat, 20 Oct 2011 - [153]
- Pulverizer mounts on bobcat, 20 Oct 201 - [154]
Biodiesel Reactor
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [155]
Open Source Backhoe
Digital Fabrication
- HydraRaptor, 6 Apr 2009 - [158]
- HydraRaptor (part 2), 7 Apr 2009 - [159]
- Detroit fab lab solenoid driver, 22 Sep 2011 - [160]
Torch Table
- Torch Table finishing 1 - 16 Apr 2011 - [161]
- Torch table with faulty Xylotex controller, 17 May 2011 - [162]
- CNC Torch Table Tip height, 11 Sep 2011 - [163]
Power Cube
- Torching Engine Mount Plates for Power Cube, Part 1, 1 Sep 2011 - [164]
- Torching Engine Mount Plates for Power Cube, Part 1, 1 Sep 2011 - [165]
- Power Cube Frames, 7 Sep 2011 - [166]
- Power Cube Welding with 90 Amp MIG Welder, 10 Sep 2011 - [167]
- Power Cube Fabrication Step 1, 11 Sep 2011 - [168]
- Power Cube Fabrication Step 2, 11 Sep 2011 - [169]
- Power Cube Fabrication Step 3, 11 Sep 2011 - [170]
- Power Cube Fabrication Step 4, 11 Sep 2011 - [www.youtube.com/watch?v=_h9LPdWWq9A&feature=plcp&context=C3008e42UAOEgsToPDskKjwYcrDbde2YMuk3QTk4to]
- Power Cube Fabrication Step 5 - Clamping, 11 Sep 2011 - [171]
- Briggs and Stratton Interim Power Cube 27 hp Engine Leak, 10 Sep 2011 - [172]
- Leak part 1, 11 Sep 2011 - [173]
- Leak part 2, 11 Sep 2011 - [174]
- Leak part 3, 11 Sep 2011 - [175]
- Battery container welding, 12 Sep 2011 - [176]
- Hydraulic Cooler Mounting, 12 Sep 2011 - [177]
- The Memorial Tom Griffing Power Cube, 12 Sep 2011 - [178]
- Power Cube Extending Plates, 12 Sep 2011 - [179]
- Tacking battery mounts, 12 Sep 2011 - [180]
- Key and throttle mounts, 12 Sep 2011 - [181]
- Battery Mount Cutting, 12 Sep 2011 - [182]
- Torching motor mount plate shaft hole, 12 Sep 2011 - [183]
- Assembly order review for power cube, 12 Sep 2011 - [184]
- Power Cube Power Switch, 13 Sep 2011 - [185]
- Hydraulic Cooler mount bolt locations, 13 Sep 2011 - [186]
- Kohler Engine mounting in PC, 14 Sep 2011 - [187]
- Hydraulic cooler mount overview, 14 Sep 2011 - [188]
- Kohler 25 hp mounting hint, 14 Sep 2011 - [189]
- Hydraulic cooler mounting and bolts, 14 Sep 2011 - [190]
- Kohler engine mounting nightmares, 14 Sep 2011 - [191]
- Tightening Kohler engine bolts, 14 Sep 2011 - [192]
- Notice on hydraulic pump mounting, 14 Sep 2011 - [193]
- Fan mounting, 14 Sep 2011 - [194]
- Pump mounting bolts size, 14 Sep 2011 - [195]
- Fan trim for power cube, 14 Sep 2011 - [196]
- Power Cube component measurements, 14 Sep 2011 - [197]
- Engine to pump coupling overview, 14 Sep 2011 - [198]
- Mounts and bolts for fans, 14 Sep 2011 - [199]
- Pump mount plate detail, 14 Sep 2011 - [200]
- Last dilemma of 25 hp Kohler mounting, 14 Sep 2011 - [201]
- Tacking hydraulic cooler in place, 14 Sep 2011 - [202]
- Tacking hydraulic cooler in place part 2, 14 Sep 2011 - [203]
- Pump Mounting refinement, 15 Sep 2011 - [204]
- Preferred engine mounting, 15 Sep 2011 - [205]
- Engine insertion into frame, 15 Sep 2011 - [206]
- Engine mounting lifetime design strategy, 15 Sep 2011 - [207]
- Pump bolt detail, 15 Sep 2011 - [208]
- Pump mounting with 4.5"x3/4" bolts, 16 Sep 2011 - [209]
- Loose pump, 16 Sep 2011 - [210]
- Welding pump plates to engine plates, 16 Sep 2011 - [211]
- Power Cube production line, 16 Sep 2011 - [212]
- Fan Attachment, 17 Sep 2011 - [213]
- Fan mount bolt pattern - welding, 17 Sep 2011 - [214]
- Fan bolt specs, 17 Sep 2011 - [215]
- Protecting bolt threads, 17 Sep 2011 - [216]
- Starter switch wiring on power cube, 20 Sep 2011 - [217]
- Irregular fan mounts, 22 Sep 2011 - [218]
- Dangling Power, 23 Sep 2011 - [219]
- Kohler starter solenoid nut, 24 Sep 2011 - [220]
- Filling power cube with hydraulic fluid, 24 Sep 2011 - [221]
- LifeTrac Power Cube chokes, 27 Sep 2011 - [222]
- Filling Tractor 2 with hydraulic fluid, 4 Oct 2011 - [223]
- Filling power cube, 4 Oct 2011 - [224]
- Muffler design, 5 Oct 2011 - [225]
- Tack Welding cooler mounts, 7 Oct 2011 - [226]
- Pump mounting variations, 7 Oct 2011 - [227]
- Torching mount plates for motor on power cube, 7 Oct 2011 - [228]
- Battery mount cutting, 7 Oct 2011 - [229]
- Tacking battery mounts, 7 Oct 2011 - [230]
- Power Cube wiring 2, 15 Oct 2011 - [231]
- Power cube tabs connecting to tractor, 15 Oct 2011 - [232]
- Case drain returns on tractor, 22 Oct 2011 - [233]
- Power cube power and return, 22 Oct 2011 - [234]
Dimensional Sawmill
- Dimensional Sawmill Part 1, 10 Sep 2011 - [235]
- Dimensional Sawmill Part 2, 10 Sep 2011 - [236]
- Dimensional Sawmill Part 3, 10 Sep 2011 - [237]
- Dimensional Sawmill Part 4, 10 Sep 2011 - [238]
- Open Source dimensional sawmill fabrication interview, 12 Sep 2011 - [239]
-Prototyping costs of dimensional sawmill, 22 Sep 2011 - [240] -Sawmill z, 22 Sep 2011 - [241]
Factor e Live
- Factor e Live, 2 Jun 2008 - [242]
- Factor e Live Week 2, 18 Jun 2008 - [243]
- Factor e Live - Part 3, 1 Jul 2008 - [244]
- Couldn't find part 4.
- Factor e Live - Part 5, 17 Aug 2008 - [245]
- Factor e Live - Part 6, Solar Turbine Beginnings, 18 Aug 2008 - [246]
- Factor e Live - Episode 7, 25 Aug 2008 - [247]
- (Factor e Live 8) Advanced CEB Press and Solar Panels, 3 Sep 2008 - [248]
- (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [249]
- (Factor e Live 10) CEB Field Testing, 16 Oct 2008 - [250]
Factor e Live Distillations
- Factor e Live Distillations (part 1), 5 Jan 2009 - [251]
- Factor e Live Distillations (part 2), 7 Jan 2009 - [252]
- Factor e Live Distillations (part 3) Towards the Open Source Tractor, 12 Jan 2009 - [253]
- Factor e Live Distillations (part 4) On the technology base for Evolving to Freedom, 13 Jan 2009 - [254]
- Factor e Live Distillations (part 5) The CEB Story - To Build a Village, 16 Jan 2009 - [255]
- Factor e Live Distillations (part 6) Personal Fabrication Machines, 20 Jan 2009 - [256]
- Factor e Live Distillations (part 7) Open Source Permaculture and Local Food Systems (part 7), 25 Jan 2009 - [257]
- Factor e Live Distillations (part 8) $1/Watt Solar Thermal Concentrator Steam Powered Electric Generator, 3 Feb 2009 - [258]
- Factor e Live Distillations (part 9) Open Collaborative Development, 5 Feb 2009 - [259]
- Factor e Live Distillations (part 10) Open Economic Model, 6 Feb 2009 - [260]
- Factor e Live Distillations - Post Scarcity Village, 10 Sep 2009 - [261]
TED Talks Event: Behind the Scenes
- Suzanne Lee's Kombucha Clothing, 27 Feb 2011 - [262]
- Meet a TED Fellow, 27 Feb 2011 - [263]
- Fellows Reception, 27 Feb 2011 - [264]
- Putting on makeup part 1, 28 Feb 2011 - [265]
- Putting on makeup part 2, 28 Feb 2011 - [266]
- Putting on makeup part 3, 28 Feb 2011 - [267]
- Random Ted Talks Clip Part 1, 28 Feb 2011 - [268]
- Random Ted Talks Clip Part 2, 28 Feb 2011 - [269]
- Random Ted Talks Clip Part 3, 2 Mar 2011 - [270]
- Random Ted Talks Clip Part 4, 4 Mar 2011 - [271]
- A Ted Talks Presentation - who?, 4 Mar 2011 - [272]
- Interview Lesa Mitchell, Kauffman Foundation, 2 Mar 2011 - [273]
- Interview with Rufus? Who? 4 Mar 2011 - [274]
- After TED Talks Update, 6 Mar 2011 - [275]
- TED Talk - Global Village Construction Set, 6 Oct 2011 - [276]
CNC Lathe
- Open Source CNC Lathe, 12 Sep 2011 - [277]
Baling/Hay Making
- Preparation for baling, 2 Oct 2011 - [278]
- Docenting the baling documentor, 2 Oct 2011 - [279]
- Mower ate a round bale, 2 Oct 2011 - [280]
- Stumped, 2 Oct 2011 - [281]
- Random Shot of Old Hay Baler, 11 Sep 2011 - [282]
- Hay conditioner 101, 2 Oct 2011 - [283]
- Meet the hay conditioner, 2 Oct 2011 - [284]
- HabLab and mowing for bales, 3 Oct 2011 - [285]
- Baling ergonomics, 5 Oct 2011 - [286]
- Countdown to baling, 5 Oct 2011 - [287]
- Baling day 1, 5 Oct 2011 - [288]
- Getting ready to bale, 5 Oct 2011 - [289]
- Baler adjustment, 5 Oct 2011 - [290]
- Engaging the baler, 5 Oct 2011 - [291]
- PTO engaged, 5 Oct 2011 - [292]
- Straw quality, 5 Oct 2011 - [293]
- First bale, 5 Oct 2011 - [294]
- Baling shakedown in progress, 5 Oct 2011 - [295]
- Baling 1, 5 Oct 2011 - [296]
- Baling 2, 5 Oct 2011 - [297]
- Baling 3, 5 Oct 2011 - [298]
- Baling 4, 5 Oct 2011 - [299]
- Baling 5, 5 Oct 2011 - [300]
- Baling 6, 5 Oct 2011 - [301]
- Baling 7, 5 Oct 2011 - [302]
- Baling 8, 6 Oct 2011 - [303]
- Baling 9, 6 Oct 2011 - [304]
- Baling day 1 summary, 6 Oct 2011 - [305]
- Baling results - day 2, 6 Oct 2011 - [306]
- On trailer to pick up bales, 7 Oct 2011 - [307]
- Picking up bales, 7 Oct 2011 - [308]
- Documentor on bales, 7 Oct 2011 - [309]
- 90 bales in 20' trailer, 7 Oct 2011 - [310]
- Stacking strawbales, 7 Oct 2011 - [311]
- Temporary bale structure, 7 Oct 2011 - [312]
- Temporary bale structure floor, 7 Oct 2011 - [313]
- Floor coming together, 7 Oct 2011 - [314]
- 8 minutes to build a platform, 7 Oct 2011 - [315]
- Beginning to stack bales on platform, 7 Oct 2011 - [316]
- Temporary bale structure, 7 Oct 2011 - [317]
- Picking up bales, 7 Oct 2011 - [318]
- Picking up bales 2, 7 Oct 2011 - [319]
- Dropping off bales, 7 Oct 2011 - [320]
Construction Plannin 2011
Workshop/HabLab
- Workshop excavation, 27 Sep 2011 - [323]
- Column excavation ergonomic analysis, 27 Sep 2011 - [324]
- Excavation workflow and ergonomics, 27 Sep 2011 - [325]
- Roof stringer structural testing plan, 27 Sep 2011 - [326]
- Pre-construction scene, 28 Sep 2011 - [327]
- Preconstruction with dozer, 28 Sep 2011 - [328]
- Preconstruction with dozer 2, 28 Sep 2011 - [329]
- Excavator beginning, 28 Sep 2011 - [330]
- Gravel spreading, 28 Sep 2011 - [331]
- HabLab 1 - bulldozing, 28 Sep 2011 - [332]
- HabLab 2, 28 Sep 2011 - [333]
- HabLab 3, 28 Sep 2011 - [334]
- HabLab 4, 28 Sep 2011 - [335]
- HabLab 5, 28 Sep 2011 - [336]
- Gravel base with skid loader, 28 Sep 2011 - [337]
- Gravel trucks, 28 Sep 2011 - [338]
- HabLab documentor, 28 Sep 2011 - [339]
- Riding the Cat D7 dozer, 28 Sep 2011 - [340]
- Cat D7 bulldozer fuel consumption, 28 Sep 2011 - [341]
- HabLab excavation, 28 Sep 2011 - [342]
- HabLab bulldozing view from Hexayurt, 28 Sep 2011 - [343]
- HabLab excavator and dozer, 28 Sep 2011 - [344]
- HabLab corner excavation, 28 Sep 2011 - [345]
- Foundation pads- night before concrete pour, 30 Sep 2011 - [346]
- Column foundation forms, 30 Sep 2011 - [347]
- Excavation discussions, 1 Oct 2011 - [348]
- Nearly finished grading, 1 Oct 2011 - [349]
- Clearing off vegetation, 1 Oct 2011 - [350]
- Dozer parking, 2 Oct 2011 - [351]
- Starting the dozing, 2 Oct 2011 - [352]
- Beginning to clear vegetation, 2 Oct 2011 - [353]
- More clearing vegetation, 2 Oct 2011 - [354]
- Excavator documentor, 2 Oct 2011 - [355]
- HabLab and mowing for bales, 3 Oct 2011 - [356]
- Concrete pads 101, 4 Oct 2011 - [357]
- Cement truck arrives, 4 Oct 2011 - [358]
- Ergonomic analysis of excavation, 5 Oct 2011 - [359]
- Screeing foundation pads, 5 Oct 2011 - [360]
- Living units- wall foundation pour, 13 Oct 2011 - [361]
- Rebar for HabLab, 13 Oct 2011 - [362]
- Preparing for wall foundations, 13 Oct 2011 - [363]
- HabLab rebar and embodied energy, 14 Oct 2011 - [364]
- HabLab foundations panorama, 14 Oct 2011 - [365]
- Ready to pour HabLab foundations, 14 Oct 2011 - [366]
- Pour panorama, 14 Oct 2011 - [367]
- Little dry, 14 Oct 2011 - [368]
- 8 cubic yards, 14 Oct 2011 - [369]
- Beginning to pour, 14 Oct 2011 - [370]
- Pour sock, 14 Oct 2011 - [371]
- Floating, 14 Oct 2011 - [372]
- Moving rebar to HabLab site, 14 Oct 2011 - [373]
- Pouring panorama, 15 Oct 2011 - [374]
- Workshop Slab, 4 Nov 2011 - [375]
- Concrete slab joints cutting, 5 Nov 2011 - [376]
- Release cut ergonomics, 5 Nov 2011 - [377]
- Workshop columns growing, 5 Nov 2011 - [378]
True Fans Update
- Dear True Fans: Production Scaling, 18 Sep 2011 - [379]
- Dear True Fans September 25, 2011, 25 Sep 2011 - [380]
- Full Steam Ahead - $60k construction grant is in, 28 Sep 2011 - [381]
- Monday Update, 3 Oct 2011 - [382]
Team Member Interviews
- Isaiah Saxon, 11 Mar 2011 - [383]
- Dan Granett, 11 Mar 2011 - [384]
- Brianna Kufa, 24 Aug 2011 - [385]
- Chris, 24 Aug 2011 - [386]
- Tom, 24 Aug 2011 - [387]
- Ian Conehead, 7 Oct 2011 - [388]
- Ted Mosher dedicated project visit, 7 Oct 2011 - [389]
- Yoonseo, 5 Nov 2011 - [390]
Business License
- OSE Certification, 3 Oct 2011 - [391]
Misc.
- Heat Exchanger, 2 Nov 2007 - [392]
- Cordwood Addition Roof, 9 Dec 2007 - [393]
- Goat Birth, 1 May 2008 - [394]
- Walnut Grafting, 4 May 2008 - [395]
- Babington Burner "Flamethrower" Atomizing Oil, 1 Oct 2008 - [396]
- Babington Burner "Flamethrower" Continued, 2 Oct 2008 - [397]
- Open Source On-Demand Water Heater, 2 Nov 2008 - [398]
- Torch Table Day 1, 10 Dec 2008 - [399]
- Ama Makes the Goat Feeder, 20 Feb 2009 - [400]
- Starting the workshop stove for the first time, 1 Mar 2009 - [401]
- Fruit Propagation Workshop, 1 Mar 2009 - [402]
- Future Kitchen, 2 Mar 2009 - [403]
- Making Notebooks, 6 Mar 2009 - [404]
- Grafting and Root Cuttings Details, 7 Mar 2009 - [405]
- Spring Rains, 16 Mar 2009 - [406]
- Hexahatch Incubator, 4 Apr 2009 - [407]
- Industry Standard Cooking Video, 11 Apr 2009 - [408]
- Goat Birth, 16 Apr 2009 - [409]
- Compressed Air Water Pump Design, 10 Jun 2009 - [410]
- Cutting Rocks, 16 Mar 2011 - [411]
- Workshop Addition Complete, 28 Mar 2011 - [412]
- Video of a Wind Turbine, 31 Mar 2011 [413]
- Polish TV Interview, 5 Apr 2011 - [414]
- Random Polish TV Interview Member Clip, 5 Apr 2011 - [415]
- Random Pig Video, 5 Apr 2011 - [416]
- Random Train Ride Clip, 5 Apr 2011 - [417]
- Random HD Sample, 11 Apr 2011 - [418]
- New Welder: Megamig 450, 16 Apr 2011 - [419]
- Welder Testing, 16 Apr 2011 - [420]
- Xylotex Controller Configuration, 16 Apr 2011 - [421]
- Remote Sensing, 17 May 2011 - [422]
- Wheel shaft gussets, 19 Jun 2011 - [423]
- Bandsaw, 19 Jun 2011 - [424]
- Project Update, 4 Aug 2011 - [425]
- Power to Solenoid, 12 Aug 2011 - [426]
- Ergonomics of Cleaning Tank Bungs Prior to Welding, 1 Sep 2011 - [427]
- Fabrication of 5 Fuel and Hydraulic Tanks, 2 Sep 2011 - [428]
- Tapping threaded holes on Engine, 2 Sep 2011 - [429]
- Meeting On Friday, 2 Sep 2011 - [430]
- Grate Shaker Assembly, 3 Sep 2011 - [431]
- Suction Strainer, 6 Sep 2011 - [432]
- True Fans Sunday Update 2, 11 Sep 2011 - [433]
- Shonda, CNC Multimachine, and the Housing Crisis, 12 Sep 2011 - [434]
- HabLab - Margaret Ida, 12 Sep 2011 - [435]
- Natural resources to product, 12 Sep 2011 - [436]
- Last prep for construction Update, 12 Sep 2011 - [437]
- Last prep for construction - loading up, 12 Sep, 2011 - [438]
- Stringers/Wood Beams for OSE Workshop 2011, 13 Sep 2011 - [439]
- KHS Class of 1991 Reunion, 14 Sep 2011 - [440]
- Roof sections for ose shop, 15 Sep 2011 - [441]
- Emergency Construction Funding - Major Success Update, 15 Sep 2011 - [442]
- Global supply chains, 15 Sep 2011 - [443]
- Chickens going freerange, 17 Sep 2011 - [444]
- Staking worksop space for earthworks, 20 Sep 2011 - [445]
- Urban Farming Guys, James Slade replications, 22 Sep 2011 - [446]
- Column foundation rebar, 22 Sep 2011 - [447]
- New Update: Toothbar bucket, tractor tracks, and dimensional sawmill bl, 23 Sep 2011 - [448]
- Random Update: Monday midnight oil update, 28 Sep 2011 - [449]
- 12 foot peach tree, 2 Oct 2011 - [450]
- Pecan apricot catalpa, 2 Oct 2011 - [451]
- Secondary cylinder, 2 Oct 2011 - [452]
- Message to Jason Fields, 3 Oct 2011 - [453]
- Pawpaw Tree, 5 Oct 2011 - [454]
- Shonda - CNC Multimachine beginnings, 8 Oct 2011 - [455]
- GVCS Kickstarter intro video, 13 Oct 2011 - [456]
- Oct 15 update, 15 Oct 2011 - [457]
- Shuttleworth Fellowship Brief, 17 Oct 2011 - [458]
- Oct 18 Update, 18 Oct 2011 - [459]
- Recovery plan on ceb construction, 20 Oct 2011 - [460]