Introduction

Different support levels indicate different rates of development.

Zero Budget Program

Under zero-budget operation with on-demand fund-raising of about $2k/month, we can:

  • 9.27.09 - Finish mud sprayer, test on CEB structure walls
  • 9.28-10.3.09 - First week of October, CEB Prototype II testing - 5000 bricks pressed
  • 10.5.09 - 10.31.09 - CEB Prototype III Build
  • November 1 , 2009 - Product Release, CEB Press. Initial release includes:
    • Design drawings (help needed)
    • Fabrication documentation (at least from Prototype II fabrication)
    • Cost Structure - $2500 for DIY production (labor discounted); $7000 for turnkey product; price may be adjusted after production optimization
    • Factor e Farm production level - 4 machines per month initially, may be scaled if needed


Accelerated Program Under $10k budget operation with grid connection

All of the above plus:

  • Accommodations for 2 more people
  • CEB floor demonstrated, and built in workshop, kitchen, and 2 existing residences


=Acceleration Budget+

  • Camper rental - ?
  • Electrical connection - ?
  • Water hookup - ?
  • Food bank access -