Aidan Williamson Log
Old Logs:
Links:
- DIY TAZ BOM
- My YouTube Channel
- [http://devel.lulzbot.com/TAZ/2.0/production_docs/Build_docs/raw_assy_pic/ Assembly Picture Repository
January 2014
1/8
Nice coverage in The New Yorker.
Completed my first print. Video is rendering at home. I will upload it another day. For now I have a video of stopping a leak in the Budaschnozzle.
http://img.youtube.com/vi/W7acDWe4hqU/default.jpg
We decided to use two 55gal drums. I cut off the saddle and will begin workign on the new one on Friday.
We are making three 25" wheels from laser cut 11ga mild steel. Here are the files we sent to the machine shop:
File:Water Wheel 25.dxf
File:Water Wheel 25.skp
1/6
A fun way to navigate this wiki is to use the random page tool. You can put this link: http://opensourceecology.org/wiki/Special:Random in your bookmarks toolbar if you are in mozilla.
This is from the other day:
http://img.youtube.com/vi/G4G7GXfV9ns/default.jpg
I started to look at the budaschnozzle. It needs to be cleaned. I started that process but ran out of time. I will document it with a video when I finish.
1/3
We decided to add 3 15 gallon barrels to the sides of the 55 gal barrel to give a total capacity of 100gal. We also lengthened our shelves. I'm ready for a day off, which is coming.
http://img.youtube.com/vi/Gpx4PmBSZtg/default.jpg http://img.youtube.com/vi/dfrwYHx87ec/default.jpg
1/2
So Christmas happened and then other stuff and it's now apparently 2014 and I haven't finished the Taz or the Water Wheel...
Ordered a part for the nozzle and then it should be 100% operational after a cleaning. Haven't had any time at all to work on it other than to build a more permanent space for it in my room.
The water wheel is coming along. I will post some videos from youtube below. It is now day 9 but they haven't really been full work days. Nothing like a production run at FeF as we are using rusty material which is not square and we don't have a complete design going in to it. It does look pretty good, though.
Finished
- Main Frame
- Wheels
- Barrel Mount
- Seat arms
- Seats
To Do:
- Water Wheel Welds
- Lots of Grinding
- Plumbing
- Water Wheel Axle
- Water Wheel Lift Mechanism
We are also considering adding another barrel for 2x water capacity.
http://img.youtube.com/vi/pcfBlHZqhGI/default.jpg http://img.youtube.com/vi/2liSUr8ZTw8/default.jpg http://img.youtube.com/vi/yOSPMLqozg8/default.jpg
http://img.youtube.com/vi/Colu1FynxQU/default.jpg http://img.youtube.com/vi/cS_mOMHhFD0/default.jpg http://img.youtube.com/vi/Y1YyX753Sfg/default.jpg http://img.youtube.com/vi/TTfgEkePOZU/default.jpg