Andrew Log

From Open Source Ecology
Revision as of 22:47, 4 October 2011 by Andrew Spina (talk | contribs)
Jump to navigation Jump to search

It's Me!

Andrew photo.png

I'm Andrew Spina. I live in Baltimore, Maryland.

October 5

  • Learned from Tom that the cube may need to be taller than 24". May have to get out my steel stretched (j/k).
  • Asked Tom about muffler design. The cube BOM mentions the muffler but the manufacturing section doesn't mention assembly. He is buying one. I may too.
  • Fixed some spelling errors on wiki pages. Hoping that I wasn't stepping on toes.


September 29

  • Verified Steel order was correct.
  • No work next week because I'm on a business trip.

September 27

  • Created a Spreadsheet to track the parts that I have, and need. More detail here[1]
  • Ordering additional Angle and steel for the Hydraulic Reservoir tomorrow.
  • Hopefully begin assembling the frame on Thursday.

September 24

  • Posted to my blog[2] about my first week of work.

September 22

  • Cut my angle to length. The bill of materials for the Power Cube was wrong I'll need more angle to build the frame.

September 19

  • Ordered 20 feet (240") of 2" by 1/4" angle iron. Cost = 65$ + tax. My awesome wife will pick it up.

September 17

  • Started talking to Tom via email about Power Cube documentation and materials.

September 15

  • got permission to use the machine shop at Baltimore County Community College to produce a Power Cube!