Cold Saw/Build Instructions

From Open Source Ecology
< Cold Saw
Revision as of 22:58, 7 June 2012 by YK (talk | contribs) (Created page with "=Vise Assembly= *'''Clamp Blocks onto Moving Blocks''': Tack weld + weld the Clamp Blocks onto the Moving Blocks, then surface grind the clamping face of the Clamp Blocks such t...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Vise Assembly

  • Clamp Blocks onto Moving Blocks: Tack weld + weld the Clamp Blocks onto the Moving Blocks, then surface grind the clamping face of the Clamp Blocks such that their clamping faces are parallel.
  • Threaded Rod and Nuts: Position the Moving Block such that the Threaded Rod can be inserted vertically. Insert the Threaded Rod, then fasten the Nut onto the threaded rod such that the nut contacts the Moving Block. Center the nut approximately then tack weld + weld the nut onto the Moving Block.