Cold Saw/Build Instructions
< Cold Saw
Jump to navigation
Jump to search
Source Hardware
http://opensourceecology.org/wiki/Cold_Saw/Sourcing
Vise: Drill Fixed Block
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block
Base: Drill Base Flat
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Base_Flat
Match drill using Fixed Block
Base: Drill Base Plate
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Baseplate
Match drill using Base Flat
Vise Assembly
- Clamp Blocks onto Moving Blocks: Tack weld + weld the Clamp Blocks onto the Moving Blocks, then surface grind the clamping face of the Clamp Blocks such that their clamping faces are parallel. Then drill the Jaw holes through the Clamp Blocks.
Match drill the Moving Blocks using the Fixed Block.
- Threaded Rod and Nuts: Position the Moving Block such that the Threaded Rod can be inserted vertically. Insert the Threaded Rod, then fasten the Nut onto the threaded rod such that the nut contacts the Moving Block. Center the nut approximately then tack weld + weld the nut onto the Moving Block.