Cold Saw/Build Instructions/Support

From Open Source Ecology
< Cold Saw‎ | Build Instructions
Revision as of 21:06, 19 June 2012 by YK (talk | contribs) (Created page with "=Support Flat to Interface Flat= Clamp the Support Flat over the Interface Flat and over the Small Support Flat on the table, with approximately parallel-coincident alignment. ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Support Flat to Interface Flat

Clamp the Support Flat over the Interface Flat and over the Small Support Flat on the table, with approximately parallel-coincident alignment.

Measure and mark the Interface Flat's Blade Guard and Hydraulic Motor holes and all of the Support Flat's holes.

Pilot drill and drill the Support Flat's Shaft hole and Stopper hole, match drilling into the Small Support Flat.

Pilot drill the Support Flat's Interface holes, match drilling into the Interface Flat.

Drill the Interface Flat's Blade Guard and Hydraulic Motor holes.