Development Infrastructure
Organization
Workshop needs a lot of organization. 100 hours should get it to a much more workable state.
Maintenance
Hablab air gaps are wreaking havoc on the inside temperature - a few bottles of expanding foam <30$ and <1hr should handle some of the big gaps.
A lot of tools need maintaining.
Second mill needs to be fixed.
Lathe needs to get operational.
Surface grinder needs to get dressed. Diamond point dressing bit is 50$, magnetic bit holder can be easily made with <20$ A36 steel block with holes and a setscrew.
First mill needs to be lubricated. 3/4" dia collet mounting problem needs to be fixed.
Bandsaw needs cutting fluid refill.
Problematic welders need troubleshooting and repair.
Inventory
Standard stock of fasteners needs to be ordered and organized.
Stock of hydraulic hoses and fittings needs ordering and organizing.
Stock of electronic components needs ordering and organizing.