Instructions and Example for Baseline Product Requirements

From Open Source Ecology
Revision as of 18:44, 3 October 2013 by Katie (talk | contribs) (Created page with "=Instructions for Baseline Product Requirements= #Use a Google Drawing #Link Requirements to Product Development Board in '''Deliverable''' column #Notify approving authority...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Instructions for Baseline Product Requirements

  1. Use a Google Drawing
  2. Link Requirements to Product Development Board in Deliverable column
  3. Notify approving authority that deliverable is ready for approval
  4. Utilize GrabCAD to post a parallel challenge once specifications are documented for a machine or module. See GrabCAD Challenge Protocol
  5. Publish the GrabCAD Challenge link and OSE Doc/Dev Platform link:
  1. Publish on blog, twitter, and Facebook.
  2. Email Design Sprint participant database to promote their involvement in GrabCAD or our Dozuki documentation/dev protocol
  3. Publicize GrabCAD challenge in Design Sprints

Example of Baseline Product Requirements

edit/comment

LifeTrac 6 Product Concept & Key Performance Parameters Template (BETA V.08-12-13)


edit/comment