Catwilmes log
Jump to navigation
Jump to search
Tuesday March 11, 2014
- White-washed the exterior, south facing wall of the HabLab
- Painted trim interior of the HabLab
Monday March 10, 2014
- Discussion of HabLab entry design, driving design, and parking design
- Created Preliminary drawings for parking
- Painted chalk wall inside of HabLab
Sunday March 9, 2014
- Review/tour of the site to understand the layout of FactorE Farm
- Talk about incorporating a summer campsite, parking lot for visitors, and improvements on the HabLab
- Painted trim on doorways of the HabLab