July 16th, 2014
First day. Guillanme and I filled nine buckets of soil from three different piles for the purpose of testing soil brick composition. The plan being one bucket from each soil type would be unstabilized (no concrete), one with medium amount of concrete, and one with what might be the maximum amount of concrete we would want to put into a brick.
We then worked on getting the soil pulverizer working. We replaced the starter solenoid on LifeTrac 4. My hypothesis for it's failure was exposure to the rain, as it was apparently working yesterday. Perhaps a covered area for the tractors and other machines would be a useful project one day.
Guillanme and I removed a bar tube piece from the arm of LifeTrac 6 and replaced it with a longer (80") piece so that the soil pulverizer can attach to both LifeTrac 4 and LifeTrac 6. Tabs were welded on the soil mixer so that it can attach to the new LT6 bar. Next the tabs will be reinforced with triangles. The existing tabs on the soil pulverizer still need to be cut off and new tabs welded so that the soil pulverizer can mount on LT 6. Finally, square bar needs to be welded on LT 4 so that it will be compatible with the soil pulverizer tabs.
July 15th, 2014
Arrived at Factor e Farm at 10:15pm!