The Liberator Packing List
Jump to navigation
Jump to search
The first step in assembling The Liberator is unpacking the crate, in the reverse order as shown on the blog. First, assess that you can identify all the following parts. The machine labels in Fig. 2 and 3 and blog post should help to identify all the parts.
The packing list is:
- Frame
- Soil grate
- Arms (2) - primary
- Arms (2) - secondary - the ones with the leg holders
- Soil loading drawer
- Legs (4)
- Feet (4)
- Back hopper supports (2)
- Front hopper supports