Foundry

From Open Source Ecology
Revision as of 00:15, 16 January 2009 by WikiSysop (talk | contribs)
Jump to navigation Jump to search
  • Google Book, Maximum Production in Machine-shop and Foundry - 150 lb shots in 1911 foundry took 3.5 hours - with noted low production - [1]
  • College foundry, 100 lb steel or iron, 100 kW induction furnace - [2]