Marcin ose YouTube Video Content

From Open Source Ecology
Revision as of 16:48, 19 December 2011 by Adam Messer (talk | contribs)
Jump to navigation Jump to search

This is an index of videos which may be used to supplement remote video editing.

Construction 2011

  • Transit use during HabLab construction - with John Marlatt, carpenter - [1]
  • Towards HabLab roof - [2] - with Floyd Hagerman; discuss steps and time required for putting on roof
  • Bulldozing construction site for HabLab - [3]

LifeTrac Tractor

  • (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [4]
  • LifeTrac Walkthrough (15 Mar 2009), 15 Mar 2009 - [5]
  • more LifeTrac detail, 18 Mar 2009 - [6]
  • Augering Post and Planting Holes, 28 Apr 2009 - [7]
  • Loader Arms Adjustment, 11 Jun 2009 - [8]
  • Lifetrac Drive, 16 Apr 2011 - [9]
  • LifeTrack III, 16 Apr 2011 - [10]
  • Bending of Tracks for Tractor, 27 Aug 2011 - [11]
  • Lifetrac Erging from Cave, 7 Sep 2011 - [12]
  • LifeTrac Trimmed in Half, 11 Sep 2011 - [13]
  • Lifetrac to Bobcat Conversion Plate, 12 Sep 2011 - [14]
  • Midnight oil episode: lifetrac shipping, 26 Sep 2011 - [15]
  • Documenting Lifetrac with Ian, 26 Sep 2011 - [16]
  • How to get Lifetrac up?, 27 Sep 2011 - [17]
  • Loading Lifetrac, 27 Sep 2011 - [18]
  • Chaining Lifetrac up, 27 Sep 2011 - [19]
  • Lifetrac up!, 27 Sep 2011 - [20]
  • Lifetrac on trailer, 27 Sep 2011 - [21]
  • Ready to ship, 27 Sep 2011 - [22]
  • Lifetrac control valves, 27 Sep 2011 - [23]
  • LifeTrac Power Cube chokes, 27 Sep 2011 - [24]
  • LifeTrac shipping off, 27 Sep 2011 - [25]
  • Industry standard bulldozer, 28 Sep 2011 - [26]
    • Toothbar
      • Open Source Tooth Bar, 22 Oct 2008 - [27]
      • Toothbar bucket prototype 2, 23 Sep 2011 - [28]
  • Welding Lifetrac tracks, 3 Oct 2011 - [29]
  • Lifetrac Tracks design and jig comments, 3 Oct 2011 - [30]
  • Filling Tractor 2 with hydraulic fluid, 4 Oct 2011 - [31]
  • Motor control valve plumbing, 7 Oct 2011 - [32]
  • First FeF Hydraulic Hack, 7 Oct 2011 - [33]
  • Lifetrac 3 tracks, 10 Oct 2011 - [34]
  • Welding remaining mufflers, 15 Oct 2011 - [35]
  • Welding lifetarac mufflers, 15 Oct 2011 - [36]
  • Lifetrac motor coupler failure, 15 Oct 2011 - [37]
  • Power cube tabs connecting to tractor, 15 Oct 2011 - [38]
  • Bobcat to Lifetrac conversion plate, 20 Oct 2011 - [39]
  • Lifetrac shaft coupler, 21 Oct 2011 - [40]
  • Bobcat hydraulics conversion, 21 Oct 2011 - [41]
  • Bobcatto Lifetrac hydraulics step 2, 21 Oct 2011 - [42]
  • Step 3, 21 Oct 2011 - [43]
  • Step 4, 21 Oct 2011 - [44]
  • Step 5, 21 Oct 2011 - [45]
  • Step 6, 21 Oct 2011 - [46]
  • Step 7, 21 Oct 2011 - [47]
  • Step 8, 21 Oct 2011 - [48]
  • Step 8.5, 21 Oct 2011 - [49]
  • Step 9, 21 Oct 2011 - [50]
  • Part 10, 21 Oct 2011 - [51]
  • Pressure relief setting, 22 Oct 2011 - [52]
  • Case drain returns on tractor, 22 Oct 2011 - [53]
  • Power cube power and return, 22 Oct 2011 - [54]
  • Prototype 1 loader mounted cement mixer 2, 11 Nov 2011 - [55]
  • Prototype 1 loader mounted cement mixer, 11 Nov 2011 - [56]
  • Getting cement mixer going, 24 Nov 2011 - [57]

---

  • Power beyond port - hack - [58]

CEB

  • CEB Cyclinder Testing, 5 Nov 2007 - [59]
  • CEB Cylinder Mounting, 26 Nov 2007 - [60]
  • CEB Testing with Hopper, 26 Dec 2007 - [61]
  • Advanced Compressed Earth Block Press Fabrication, 18 Jan 2008 - [62]
  • CEB Cylinder Mounting Assembly Preparation, 18 Jan 2008 - [63]
  • CEB Press Plate Box, 18 Jan 2008 - [64]
  • Compressed Earth Block Press Press Plate Testing, 18 Jan 2008 - [65]
  • CEB Cylinder Mounting in Frame, 18 Jan 2008 - [66]
  • First Completed CEB Prototype Testing, 18 Jan 2008 - [67]
  • First CEB Block Ejected, 18 Jan 2008 - [68]
  • Factor e Live 8, Advanced CEB Press and Solar Panels, 3 Sep 2008 - [69]
  • (Factor e Live 10) CEB Field Testing, 16 Oct 2008 - [70]
  • Open Source CEB Press Production Test Runs, 5 Nov 2008 - [71]
  • CEB Brick Production Day 1, 9 Nov 2008 - [72]
  • 5000 Compressed Earth Bricks Pressed, 25 Nov 2008 - [73]
  • CEB field report - 5691 bricks pressed, 27 Nov 2008 - [74]
  • Populating the CEB addition, 29 Nov 2008 - [75]
  • CEB Plan B - Snow flurries, 30 Nov 2008 - [76]
  • First CEB Brick Laid, 2 Dec 2008 - [77]
  • First CEB Wall Section, 3 Dec 2008 - [78]
  • CEB Wall Growing, 8 Dec 2008 - [79]
  • Mounting the trusses on the CEB building, 11 Dec 2008 - [80]
  • CEB Addition Near Completion, 19 Dec 2008 - [81]
  • Factor e Live Distillations (part 5) The CEB Story - To Build a Village, 16 Jan 2009 - [82]
  • CEB, Hexacube, and Hexayurt, 23 Feb 2009 - [83]
  • Green Roof, 26 Feb 2009 - [84]
  • CEB Hopper Problem Statement, 26 Feb 2009 - [85]
  • Hexacube 2, 5 Mar 2009 - [86]
  • Liberator 2 function, 12 Apr 2009 - [87]
  • CEB controller testing with secondary cylinder, 18/12/11 - [88]
  • CEB Controller 2011, 27 Aug 2011 - [89]
  • Compression Chamber Quality Control, 1 Sep 2011 - [90]
  • CEB Hoppers, 6 Sep 2011 - [91]
  • Finising CEB Hoppers, 7 Sep 2011 - [92]
  • CEB Secondary Cylinder hydraulic Connection, 10 Sep 2011 - [93]
  • CEB needle valve, 19 Sep 2011 - [94]
  • Main CEB cylinder testing, 19 Sep 2011 - [95]
  • Full CEB Automation with Detroit Fab Lab Solenoid Drivers, 19 Sep 2011 - [96]
  • Speed control needle valve, 23 Sep 2011 - [97]
  • Ceb column foundation rebar, 24 Sep 2011 - [98]
  • CEB vault prototype, 28 Sep 2011 - [99]
  • 1 Squaring CEB Drawer, 2 Oct 2011 - [100]
  • 2 frame jig, 2 Oct 2011 - [101]
  • 3 fitting cylinder, 2 Oct 2011 - [102]
  • 4 frame and roller guide holes, 2 Oct 2011 - [103]
  • 5 frame jig turning, 3 Oct 2011 - [104]
  • 6 frame welding, 3 Oct 2011 - [105]
  • 7 making bolts, 3 Oct 2011 - [106]
  • 8 shims squaring drawer, 3 Oct 2011 - [107]
  • 9 squaring hyd cylinder, 3 Oct 2011 - [108]
  • 10 stretching the frame, 3 Oct 2011 - [109]
  • 11 torching sensor holes, 3 Oct 2011 - [110]
  • Controller wiring 1, 7 Oct 2011 - [111]
  • Controller wiring 2&3, 7 Oct 2011 - [112]
  • Controller wiring 4, 7 Oct 2011 - [113]
  • Controller 5, 7 Oct 2011 - [114]
  • Controller 6, 7 Oct 2011 - [115]
  • CEB finishing, 7 Oct 2011 - [116]
  • Placing CEB press in position, 20 Oct 2011 - [117]
  • Foundation plus positioning CEB in place, 21 Oct 2011 - [118]
  • outer members, 21 Oct 2011 - [119]
  • installing drawers, 22 Oct 2011 - [120]
  • properly installed drawers, 22 Oct 2011 - [121]
  • CEB Pressing setup, 22 Oct 2011 - [122]
  • Brick pressing under way, 27 Oct 2011 - [123]
  • Pressing - grate, 27 Oct 2011 - [124]
  • CEB microcontroller repair, 28 Oct 2011 - [125]
  • Solenoid driver replacement, 28 Oct 2011 - [126]
  • Saturday the 29th pressing, 29 Oct 2011 - [127]
  • CEB slurry preparation, 4 Nov 2011 - [128]
  • Nov 12 pressing, 12 Nov 2011 - [129]
  • Bridging, 12 Nov 2011 - [130]
  • Meeting of the CEB presses, 12 Nov 2011 - [131]
  • Forking pallets of bricks, 12 Nov 2011 - [132]
  • Bricks on pallets, 12 Nov 2011 - [133]
  • Powell machine, 12 Nov 2011 - [134]
  • Pressing scene, 12 Nov 2011 - [135]
  • Moving Powell Machine on the scene, 13 Nov 2011 - [136]
  • Press Meeting, 13 Nov 2011 - [137]
  • Press on trailer, 13 Nov 2011 - [138]
  • Column laying tutorial with Yoonseo, 13 Nov 2011 - [139]
  • Moving lumber for roof boxes, 14 Nov 2011 - [140]
  • Moving lumber for roofs, 14 Nov 2011 - [141]
  • Preparing to build columns, 14 Nov 2011 - [142]
  • Reinforcing main compression chamber, 14 Nov 2011 - [143]
  • CEB press- fitting cracked, 16 Nov 2011 - [144]
  • CEB Construction Review, 16 Nov 2011 - [145]
  • 2 CEB presses in action, 24 Nov 2011 - [146]
  • Brick city, 24 Nov 2011 - [147]
  • Windrows of soil, 24 Nov 2011 - [148]
  • Reject lime soil amendment, 24 Nov 2011 - [149]
  • From pulverizer to brick, 25 Nov 2011 - [150]
  • Pulverizer munching soil, 25 Nov 2011 - [151]
  • From pulverizer to brick line, 25 Nov 2011 - [152]
  • Reject Lime Blocks, 25 Nov 2011 - [153]
  • Column prototype, 25 Nov 2011 - [154]
  • 1600 bricks on October 18, 25 Nov 2011 - [155]
  • Loading soil without pulverizer, 25 Nov 2011 - [156]
  • Loading hopper straight from loader bucket, 26 Nov 2011 - [157]
  • Shaker function, 26 Nov 2011 - [158]
  • 1 minute of pressing, 26 Nov 2011 - [159]
  • 1 minute pressing 2, 26 Nov 2011 - [160]
  • Perfect day for pressing bricks, 26 Nov 2011 - [161]
  • Another minute of pressing - 6" tall bricks, 26 Nov 2011 - [162]
  • Shaker and stacking, 26 Nov 2011 - [163]
  • Loading soil without pulverizer, 26 Nov 2011 - [164]
  • Shaker detail, 26 Nov 2011 - [165]
  • Shaker shaking soil down ceb machine, 26 Nov 2011 - [166]
  • Another minute, 26 Nov 2011 - [167]

---

  • roller setup - [168]
  • Grate modification - [169]
  • Reinforcing compression chamber - [170]
  • Shaker in action - [171]
  • Controller board etching playlist - [172]

Professional Review

  • CEB Construction Review, 16 Nov 2011 - [173]
  • Covering the Workshop, 22 Nov 2011 - [174]
  • Floyd on structure stability, 22 Nov 2011 - [175]
  • Next steps on roof with John the carpenter, 22 Nov 2011 - [176]
  • Anchoring The roof in, 23 Nov 2011 - [177]
  • Workshop alignment, 25 Nov 2011 - [178]
  • Roof on mid of next week, 25 Nov 2011 - [179]
  • Reject Lime Blocks, 25 Nov 2011 - [180]
  • Column prototype, 25 Nov 2011 - [181]
  • -Perfect day for pressing bricks, 26 Nov 2011 - [182]

Solar

  • Solar Panel Construction 1, 21 Jul 2008 - [183]
  • Solar Panel Construction 2, 21 Jul 2008 - [184]
  • Solar Panel Construction 3, 21 Jul 2008 - [185]
  • Factor e Live 8, Advanced CEB Press and Solar Panels, 3 Sep 2008 - [186]
  • (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [187]

Digging

  • Rotary Hydraulic Well Digging, 3 Apr 2008 - [188]
  • Digging a Well Part 2, 6 Aug 2008 - [189]
  • Augering Post and Planting Holes, 28 Apr 2009 - [190]

Rototiller/Soil Pulverizer

  • (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [191]
  • Soil pulverizer prototype 3, 22 Sep 2011 - [192]
  • Pulverizer stop angle mod, 22 Sep 2011 - [193]
  • Soil Pulverizer prototype 3 complete, 23 Sep 2011 - [194]
  • Soil Pulverizer prototype 3 welding, 23 Sep 2011 - [195]
  • Loading soil Pulverizer - mower, 3 Oct 2011 - [196]
  • Soil Pulverizer prototype 3, 8 Oct 2011 - [197]
  • Bobcat meets pulverizer, 20 Oct 2011 - [198]
  • Soil Pulverizer on bobcat, 20 Oct 2011 - [199]
  • Pulverizer mounts on bobcat, 20 Oct 201 - [200]
  • Soil pulverizer field testing report, 24 Nov 2011 - [201]
  • From pulverizer to brick, 25 Nov 2011 - [202]
  • Pulverizer munching soil, 25 Nov 2011 - [203]
  • From pulverizer to brick line, 25 Nov 2011 - [204]
  • Reject Lime Blocks, 25 Nov 2011 - [205]
  • Loading soil without pulverizer, 25 Nov 2011 - [206]
  • Loading soil without pulverizer, 25 Nov 2011 - [207]
  • Loading hopper straight from loader bucket, 26 Nov 2011 - [208]

Biodiesel Reactor

  • (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [209]

Open Source Backhoe

  • Open Source Backhoe, 19 Oct 2008 - [210]
  • Open Source Tooth Bar, 22 Oct 2008 - [211]

Digital Fabrication

  • HydraRaptor, 6 Apr 2009 - [212]
  • HydraRaptor (part 2), 7 Apr 2009 - [213]
  • Detroit fab lab solenoid driver, 22 Sep 2011 - [214]

Torch Table

  • Torch Table finishing 1 - 16 Apr 2011 - [215]
  • Torch table with faulty Xylotex controller, 17 May 2011 - [216]
  • CNC Torch Table Tip height, 11 Sep 2011 - [217]

Power Cube

  • Torching Engine Mount Plates for Power Cube, Part 1, 1 Sep 2011 - [218]
  • Torching Engine Mount Plates for Power Cube, Part 1, 1 Sep 2011 - [219]
  • Power Cube Frames, 7 Sep 2011 - [220]
  • Power Cube Welding with 90 Amp MIG Welder, 10 Sep 2011 - [221]
  • Power Cube Fabrication Step 1, 11 Sep 2011 - [222]
  • Power Cube Fabrication Step 2, 11 Sep 2011 - [223]
  • Power Cube Fabrication Step 3, 11 Sep 2011 - [224]
  • Power Cube Fabrication Step 4, 11 Sep 2011 - [www.youtube.com/watch?v=_h9LPdWWq9A&feature=plcp&context=C3008e42UAOEgsToPDskKjwYcrDbde2YMuk3QTk4to]
  • Power Cube Fabrication Step 5 - Clamping, 11 Sep 2011 - [225]
  • Briggs and Stratton Interim Power Cube 27 hp Engine Leak, 10 Sep 2011 - [226]
  • Leak part 1, 11 Sep 2011 - [227]
  • Leak part 2, 11 Sep 2011 - [228]
  • Leak part 3, 11 Sep 2011 - [229]
  • Battery container welding, 12 Sep 2011 - [230]
  • Hydraulic Cooler Mounting, 12 Sep 2011 - [231]
  • The Memorial Tom Griffing Power Cube, 12 Sep 2011 - [232]
  • Power Cube Extending Plates, 12 Sep 2011 - [233]
  • Tacking battery mounts, 12 Sep 2011 - [234]
  • Key and throttle mounts, 12 Sep 2011 - [235]
  • Battery Mount Cutting, 12 Sep 2011 - [236]
  • Torching motor mount plate shaft hole, 12 Sep 2011 - [237]
  • Assembly order review for power cube, 12 Sep 2011 - [238]
  • Power Cube Power Switch, 13 Sep 2011 - [239]
  • Hydraulic Cooler mount bolt locations, 13 Sep 2011 - [240]
  • Kohler Engine mounting in PC, 14 Sep 2011 - [241]
  • Hydraulic cooler mount overview, 14 Sep 2011 - [242]
  • Kohler 25 hp mounting hint, 14 Sep 2011 - [243]
  • Hydraulic cooler mounting and bolts, 14 Sep 2011 - [244]
  • Kohler engine mounting nightmares, 14 Sep 2011 - [245]
  • Tightening Kohler engine bolts, 14 Sep 2011 - [246]
  • Notice on hydraulic pump mounting, 14 Sep 2011 - [247]
  • Fan mounting, 14 Sep 2011 - [248]
  • Pump mounting bolts size, 14 Sep 2011 - [249]
  • Fan trim for power cube, 14 Sep 2011 - [250]
  • Power Cube component measurements, 14 Sep 2011 - [251]
  • Engine to pump coupling overview, 14 Sep 2011 - [252]
  • Mounts and bolts for fans, 14 Sep 2011 - [253]
  • Pump mount plate detail, 14 Sep 2011 - [254]
  • Last dilemma of 25 hp Kohler mounting, 14 Sep 2011 - [255]
  • Tacking hydraulic cooler in place, 14 Sep 2011 - [256]
  • Tacking hydraulic cooler in place part 2, 14 Sep 2011 - [257]
  • Pump Mounting refinement, 15 Sep 2011 - [258]
  • Preferred engine mounting, 15 Sep 2011 - [259]
  • Engine insertion into frame, 15 Sep 2011 - [260]
  • Engine mounting lifetime design strategy, 15 Sep 2011 - [261]
  • Pump bolt detail, 15 Sep 2011 - [262]
  • Pump mounting with 4.5"x3/4" bolts, 16 Sep 2011 - [263]
  • Loose pump, 16 Sep 2011 - [264]
  • Welding pump plates to engine plates, 16 Sep 2011 - [265]
  • Power Cube production line, 16 Sep 2011 - [266]
  • Fan Attachment, 17 Sep 2011 - [267]
  • Fan mount bolt pattern - welding, 17 Sep 2011 - [268]
  • Fan bolt specs, 17 Sep 2011 - [269]
  • Protecting bolt threads, 17 Sep 2011 - [270]
  • Starter switch wiring on power cube, 20 Sep 2011 - [271]
  • Irregular fan mounts, 22 Sep 2011 - [272]
  • Dangling Power, 23 Sep 2011 - [273]
  • Kohler starter solenoid nut, 24 Sep 2011 - [274]
  • Filling power cube with hydraulic fluid, 24 Sep 2011 - [275]
  • LifeTrac Power Cube chokes, 27 Sep 2011 - [276]
  • Filling Tractor 2 with hydraulic fluid, 4 Oct 2011 - [277]
  • Filling power cube, 4 Oct 2011 - [278]
  • Muffler design, 5 Oct 2011 - [279]
  • Tack Welding cooler mounts, 7 Oct 2011 - [280]
  • Pump mounting variations, 7 Oct 2011 - [281]
  • Torching mount plates for motor on power cube, 7 Oct 2011 - [282]
  • Battery mount cutting, 7 Oct 2011 - [283]
  • Tacking battery mounts, 7 Oct 2011 - [284]
  • Power Cube wiring 2, 15 Oct 2011 - [285]
  • Power cube tabs connecting to tractor, 15 Oct 2011 - [286]
  • Case drain returns on tractor, 22 Oct 2011 - [287]
  • Power cube power and return, 22 Oct 2011 - [288]

Dimensional Sawmill

  • Dimensional Sawmill Part 1, 10 Sep 2011 - [289]
  • Dimensional Sawmill Part 2, 10 Sep 2011 - [290]
  • Dimensional Sawmill Part 3, 10 Sep 2011 - [291]
  • Dimensional Sawmill Part 4, 10 Sep 2011 - [292]
  • Open Source dimensional sawmill fabrication interview, 12 Sep 2011 - [293]

-Prototyping costs of dimensional sawmill, 22 Sep 2011 - [294] -Sawmill z, 22 Sep 2011 - [295]

Factor e Live

  • Factor e Live, 2 Jun 2008 - [296]
  • Factor e Live Week 2, 18 Jun 2008 - [297]
  • Factor e Live - Part 3, 1 Jul 2008 - [298]
  • Couldn't find part 4.
  • Factor e Live - Part 5, 17 Aug 2008 - [299]
  • Factor e Live - Part 6, Solar Turbine Beginnings, 18 Aug 2008 - [300]
  • Factor e Live - Episode 7, 25 Aug 2008 - [301]
  • (Factor e Live 8) Advanced CEB Press and Solar Panels, 3 Sep 2008 - [302]
  • (Factor e Live 9) Open Source Tractor, Rototiller, Biodiesel Reactor, Solar Panels, 21 Sep 2008 - [303]
  • (Factor e Live 10) CEB Field Testing, 16 Oct 2008 - [304]

Factor e Live Distillations

  • Factor e Live Distillations (part 1), 5 Jan 2009 - [305]
  • Factor e Live Distillations (part 2), 7 Jan 2009 - [306]
  • Factor e Live Distillations (part 3) Towards the Open Source Tractor, 12 Jan 2009 - [307]
  • Factor e Live Distillations (part 4) On the technology base for Evolving to Freedom, 13 Jan 2009 - [308]
  • Factor e Live Distillations (part 5) The CEB Story - To Build a Village, 16 Jan 2009 - [309]
  • Factor e Live Distillations (part 6) Personal Fabrication Machines, 20 Jan 2009 - [310]
  • Factor e Live Distillations (part 7) Open Source Permaculture and Local Food Systems (part 7), 25 Jan 2009 - [311]
  • Factor e Live Distillations (part 8) $1/Watt Solar Thermal Concentrator Steam Powered Electric Generator, 3 Feb 2009 - [312]
  • Factor e Live Distillations (part 9) Open Collaborative Development, 5 Feb 2009 - [313]
  • Factor e Live Distillations (part 10) Open Economic Model, 6 Feb 2009 - [314]
  • Factor e Live Distillations - Post Scarcity Village, 10 Sep 2009 - [315]

TED Talks Event: Behind the Scenes

  • Suzanne Lee's Kombucha Clothing, 27 Feb 2011 - [316]
  • Meet a TED Fellow, 27 Feb 2011 - [317]
  • Fellows Reception, 27 Feb 2011 - [318]
  • Putting on makeup part 1, 28 Feb 2011 - [319]
  • Putting on makeup part 2, 28 Feb 2011 - [320]
  • Putting on makeup part 3, 28 Feb 2011 - [321]
  • Random Ted Talks Clip Part 1, 28 Feb 2011 - [322]
  • Random Ted Talks Clip Part 2, 28 Feb 2011 - [323]
  • Random Ted Talks Clip Part 3, 2 Mar 2011 - [324]
  • Random Ted Talks Clip Part 4, 4 Mar 2011 - [325]
  • A Ted Talks Presentation - who?, 4 Mar 2011 - [326]
  • Interview Lesa Mitchell, Kauffman Foundation, 2 Mar 2011 - [327]
  • Interview with Rufus? Who? 4 Mar 2011 - [328]
  • After TED Talks Update, 6 Mar 2011 - [329]
  • TED Talk - Global Village Construction Set, 6 Oct 2011 - [330]

CNC Lathe

  • Open Source CNC Lathe, 12 Sep 2011 - [331]

Baling/Hay Making

  • Preparation for baling, 2 Oct 2011 - [332]
  • Docenting the baling documentor, 2 Oct 2011 - [333]
  • Mower ate a round bale, 2 Oct 2011 - [334]
  • Stumped, 2 Oct 2011 - [335]
  • Random Shot of Old Hay Baler, 11 Sep 2011 - [336]
  • Hay conditioner 101, 2 Oct 2011 - [337]
  • Meet the hay conditioner, 2 Oct 2011 - [338]
  • HabLab and mowing for bales, 3 Oct 2011 - [339]
  • Baling ergonomics, 5 Oct 2011 - [340]
  • Countdown to baling, 5 Oct 2011 - [341]
  • Baling day 1, 5 Oct 2011 - [342]
  • Getting ready to bale, 5 Oct 2011 - [343]
  • Baler adjustment, 5 Oct 2011 - [344]
  • Engaging the baler, 5 Oct 2011 - [345]
  • PTO engaged, 5 Oct 2011 - [346]
  • Straw quality, 5 Oct 2011 - [347]
  • First bale, 5 Oct 2011 - [348]
  • Baling shakedown in progress, 5 Oct 2011 - [349]
  • Baling 1, 5 Oct 2011 - [350]
  • Baling 2, 5 Oct 2011 - [351]
  • Baling 3, 5 Oct 2011 - [352]
  • Baling 4, 5 Oct 2011 - [353]
  • Baling 5, 5 Oct 2011 - [354]
  • Baling 6, 5 Oct 2011 - [355]
  • Baling 7, 5 Oct 2011 - [356]
  • Baling 8, 6 Oct 2011 - [357]
  • Baling 9, 6 Oct 2011 - [358]
  • Baling day 1 summary, 6 Oct 2011 - [359]
  • Baling results - day 2, 6 Oct 2011 - [360]
  • On trailer to pick up bales, 7 Oct 2011 - [361]
  • Picking up bales, 7 Oct 2011 - [362]
  • Documentor on bales, 7 Oct 2011 - [363]
  • 90 bales in 20' trailer, 7 Oct 2011 - [364]
  • Stacking strawbales, 7 Oct 2011 - [365]
  • Temporary bale structure, 7 Oct 2011 - [366]
  • Temporary bale structure floor, 7 Oct 2011 - [367]
  • Floor coming together, 7 Oct 2011 - [368]
  • 8 minutes to build a platform, 7 Oct 2011 - [369]
  • Beginning to stack bales on platform, 7 Oct 2011 - [370]
  • Temporary bale structure, 7 Oct 2011 - [371]
  • Picking up bales, 7 Oct 2011 - [372]
  • Picking up bales 2, 7 Oct 2011 - [373]
  • Dropping off bales, 7 Oct 2011 - [374]

Construction Planning 2011

  • Construction planning 1, 12 Oct 2011 - [375]
  • Construction planning 2, 10 Oct 2011 - [376]

Workshop/HabLab

  • Workshop excavation, 27 Sep 2011 - [377]
  • Column excavation ergonomic analysis, 27 Sep 2011 - [378]
  • Excavation workflow and ergonomics, 27 Sep 2011 - [379]
  • Roof stringer structural testing plan, 27 Sep 2011 - [380]
  • Pre-construction scene, 28 Sep 2011 - [381]
  • Preconstruction with dozer, 28 Sep 2011 - [382]
  • Preconstruction with dozer 2, 28 Sep 2011 - [383]
  • Excavator beginning, 28 Sep 2011 - [384]
  • Gravel spreading, 28 Sep 2011 - [385]
  • HabLab 1 - bulldozing, 28 Sep 2011 - [386]
  • HabLab 2, 28 Sep 2011 - [387]
  • HabLab 3, 28 Sep 2011 - [388]
  • HabLab 4, 28 Sep 2011 - [389]
  • HabLab 5, 28 Sep 2011 - [390]
  • Gravel base with skid loader, 28 Sep 2011 - [391]
  • Gravel trucks, 28 Sep 2011 - [392]
  • HabLab documentor, 28 Sep 2011 - [393]
  • Riding the Cat D7 dozer, 28 Sep 2011 - [394]
  • Cat D7 bulldozer fuel consumption, 28 Sep 2011 - [395]
  • HabLab excavation, 28 Sep 2011 - [396]
  • HabLab bulldozing view from Hexayurt, 28 Sep 2011 - [397]
  • HabLab excavator and dozer, 28 Sep 2011 - [398]
  • HabLab corner excavation, 28 Sep 2011 - [399]
  • Foundation pads- night before concrete pour, 30 Sep 2011 - [400]
  • Column foundation forms, 30 Sep 2011 - [401]
  • Excavation discussions, 1 Oct 2011 - [402]
  • Nearly finished grading, 1 Oct 2011 - [403]
  • Clearing off vegetation, 1 Oct 2011 - [404]
  • Dozer parking, 2 Oct 2011 - [405]
  • Starting the dozing, 2 Oct 2011 - [406]
  • Beginning to clear vegetation, 2 Oct 2011 - [407]
  • More clearing vegetation, 2 Oct 2011 - [408]
  • Excavator documentor, 2 Oct 2011 - [409]
  • HabLab and mowing for bales, 3 Oct 2011 - [410]
  • Concrete pads 101, 4 Oct 2011 - [411]
  • Cement truck arrives, 4 Oct 2011 - [412]
  • Ergonomic analysis of excavation, 5 Oct 2011 - [413]
  • Screeing foundation pads, 5 Oct 2011 - [414]
  • Living units- wall foundation pour, 13 Oct 2011 - [415]
  • Rebar for HabLab, 13 Oct 2011 - [416]
  • Preparing for wall foundations, 13 Oct 2011 - [417]
  • HabLab rebar and embodied energy, 14 Oct 2011 - [418]
  • HabLab foundations panorama, 14 Oct 2011 - [419]
  • Ready to pour HabLab foundations, 14 Oct 2011 - [420]
  • Pour panorama, 14 Oct 2011 - [421]
  • Little dry, 14 Oct 2011 - [422]
  • 8 cubic yards, 14 Oct 2011 - [423]
  • Beginning to pour, 14 Oct 2011 - [424]
  • Pour sock, 14 Oct 2011 - [425]
  • Floating, 14 Oct 2011 - [426]
  • Moving rebar to HabLab site, 14 Oct 2011 - [427]
  • Pouring panorama, 15 Oct 2011 - [428]
  • Workshop Slab, 4 Nov 2011 - [429]
  • Concrete slab joints cutting, 5 Nov 2011 - [430]
  • Release cut ergonomics, 5 Nov 2011 - [431]
  • Workshop columns growing, 5 Nov 2011 - [432]
  • Saturday the 29th pressing, 29 Oct 2011 - [433]
  • CEB slurry preparation, 4 Nov 2011 - [434]
  • Nov 12 pressing, 12 Nov 2011 - [435]
  • Bridging, 12 Nov 2011 - [436]
  • Meeting of the CEB presses, 12 Nov 2011 - [437]
  • Forking pallets of bricks, 12 Nov 2011 - [438]
  • Bricks on pallets, 12 Nov 2011 - [439]
  • Powell machine, 12 Nov 2011 - [440]
  • Pressing scene, 12 Nov 2011 - [441]
  • Moving Powell Machine on the scene, 13 Nov 2011 - [442]
  • Press Meeting, 13 Nov 2011 - [443]
  • Press on trailer, 13 Nov 2011 - [444]
  • Column laying tutorial with Yoonseo, 13 Nov 2011 - [445]
  • Moving lumber for roof boxes, 14 Nov 2011 - [446]
  • Moving lumber for roofs, 14 Nov 2011 - [447]
  • Preparing to build columns, 14 Nov 2011 - [448]
  • Covering the Workshop, 22 Nov 2011 - [449]
  • Floyd on structure stability, 22 Nov 2011 - [450]
  • Next steps on roof with John the carpenter, 22 Nov 2011 - [451]
  • Monday morning workshop construction, 22 Nov 2011 - [452]
  • Anchoring The roof in, 23 Nov 2011 - [453]
  • Workshop roof preparation, 24 Nov 2011 - [454]
  • Temporary posts, 24 Nov 2011 - [455]
  • Brick city, 24 Nov 2011 - [456]
  • Leveling workshop frame, 24 Nov 2011 - [457]
  • Workshop skeleton, 24 Nov 2011 - [458]
  • Strawbales and shop, 24 Nov 2011 - [459]
  • Workshop alignment, 25 Nov 2011 - [460]
  • Putting roof sections on workshop, 25 Nov 2011 - [461]
  • Roof sections lean on roof, 25 Nov 2011 - [462]
  • Roof on mid of next week, 25 Nov 2011 - [463]
  • Monday 21st November construction scene, 25 Nov 2011 - [464]
  • Column prototype, 25 Nov 2011 - [465]
  • 1600 bricks on October 18, 25 Nov 2011 - [466]
  • First use of workshop, 27 Nov 2011 - [467]
  • Workshop+James Slade, 28 Nov 2011 - [468]

True Fans Update

  • Dear True Fans: Production Scaling, 18 Sep 2011 - [469]
  • Dear True Fans September 25, 2011, 25 Sep 2011 - [470]
  • Full Steam Ahead - $60k construction grant is in, 28 Sep 2011 - [471]
  • Monday Update, 3 Oct 2011 - [472]

Team Member Interviews

  • Isaiah Saxon, 11 Mar 2011 - [473]
  • Dan Granett, 11 Mar 2011 - [474]
  • Brianna Kufa, 24 Aug 2011 - [475]
  • Chris, 24 Aug 2011 - [476]
  • Tom, 24 Aug 2011 - [477]
  • Ian Conehead, 7 Oct 2011 - [478]
  • Ted Mosher dedicated project visit, 7 Oct 2011 - [479]
  • Yoonseo, 5 Nov 2011 - [480]

Business License

  • OSE Certification, 3 Oct 2011 - [481]

Misc.

  • Heat Exchanger, 2 Nov 2007 - [482]
  • Cordwood Addition Roof, 9 Dec 2007 - [483]
  • Goat Birth, 1 May 2008 - [484]
  • Walnut Grafting, 4 May 2008 - [485]
  • Babington Burner "Flamethrower" Atomizing Oil, 1 Oct 2008 - [486]
  • Babington Burner "Flamethrower" Continued, 2 Oct 2008 - [487]
  • Open Source On-Demand Water Heater, 2 Nov 2008 - [488]
  • Torch Table Day 1, 10 Dec 2008 - [489]
  • Ama Makes the Goat Feeder, 20 Feb 2009 - [490]
  • Starting the workshop stove for the first time, 1 Mar 2009 - [491]
  • Fruit Propagation Workshop, 1 Mar 2009 - [492]
  • Future Kitchen, 2 Mar 2009 - [493]
  • Making Notebooks, 6 Mar 2009 - [494]
  • Grafting and Root Cuttings Details, 7 Mar 2009 - [495]
  • Spring Rains, 16 Mar 2009 - [496]
  • Hexahatch Incubator, 4 Apr 2009 - [497]
  • Industry Standard Cooking Video, 11 Apr 2009 - [498]
  • Goat Birth, 16 Apr 2009 - [499]
  • Compressed Air Water Pump Design, 10 Jun 2009 - [500]
  • Cutting Rocks, 16 Mar 2011 - [501]
  • Workshop Addition Complete, 28 Mar 2011 - [502]
  • Video of a Wind Turbine, 31 Mar 2011 [503]
  • Polish TV Interview, 5 Apr 2011 - [504]
  • Random Polish TV Interview Member Clip, 5 Apr 2011 - [505]
  • Random Pig Video, 5 Apr 2011 - [506]
  • Random Train Ride Clip, 5 Apr 2011 - [507]
  • Random HD Sample, 11 Apr 2011 - [508]
  • New Welder: Megamig 450, 16 Apr 2011 - [509]
  • Welder Testing, 16 Apr 2011 - [510]
  • Xylotex Controller Configuration, 16 Apr 2011 - [511]
  • Remote Sensing, 17 May 2011 - [512]
  • Wheel shaft gussets, 19 Jun 2011 - [513]
  • Bandsaw, 19 Jun 2011 - [514]
  • Project Update, 4 Aug 2011 - [515]
  • Power to Solenoid, 12 Aug 2011 - [516]
  • Ergonomics of Cleaning Tank Bungs Prior to Welding, 1 Sep 2011 - [517]
  • Fabrication of 5 Fuel and Hydraulic Tanks, 2 Sep 2011 - [518]
  • Tapping threaded holes on Engine, 2 Sep 2011 - [519]
  • Meeting On Friday, 2 Sep 2011 - [520]
  • Grate Shaker Assembly, 3 Sep 2011 - [521]
  • Suction Strainer, 6 Sep 2011 - [522]
  • True Fans Sunday Update 2, 11 Sep 2011 - [523]
  • Shonda, CNC Multimachine, and the Housing Crisis, 12 Sep 2011 - [524]
  • HabLab - Margaret Ida, 12 Sep 2011 - [525]
  • Natural resources to product, 12 Sep 2011 - [526]
  • Last prep for construction Update, 12 Sep 2011 - [527]
  • Last prep for construction - loading up, 12 Sep, 2011 - [528]
  • Stringers/Wood Beams for OSE Workshop 2011, 13 Sep 2011 - [529]
  • KHS Class of 1991 Reunion, 14 Sep 2011 - [530]
  • Roof sections for ose shop, 15 Sep 2011 - [531]
  • Emergency Construction Funding - Major Success Update, 15 Sep 2011 - [532]
  • Global supply chains, 15 Sep 2011 - [533]
  • Chickens going freerange, 17 Sep 2011 - [534]
  • Staking worksop space for earthworks, 20 Sep 2011 - [535]
  • Urban Farming Guys, James Slade replications, 22 Sep 2011 - [536]
  • Column foundation rebar, 22 Sep 2011 - [537]
  • New Update: Toothbar bucket, tractor tracks, and dimensional sawmill bl, 23 Sep 2011 - [538]
  • Random Update: Monday midnight oil update, 28 Sep 2011 - [539]
  • 12 foot peach tree, 2 Oct 2011 - [540]
  • Pecan apricot catalpa, 2 Oct 2011 - [541]
  • Secondary cylinder, 2 Oct 2011 - [542]
  • Message to Jason Fields, 3 Oct 2011 - [543]
  • Pawpaw Tree, 5 Oct 2011 - [544]
  • Shonda - CNC Multimachine beginnings, 8 Oct 2011 - [545]
  • GVCS Kickstarter intro video, 13 Oct 2011 - [546]
  • Oct 15 update, 15 Oct 2011 - [547]
  • Shuttleworth Fellowship Brief, 17 Oct 2011 - [548]
  • Oct 18 Update, 18 Oct 2011 - [549]
  • Recovery plan on ceb construction, 20 Oct 2011 - [550]

Cement Mixer

  • Loader mounted cement mixer, 26 Nov 2011 - [551]
  • Cement mixer in action, 26 Nov 2011 - [552]
  • Mixer lid closed, 26 Nov 2011 - [553]
  • Loading cement mixer, 26 Nov 2011 - [554]
  • Attaching mixer to bobcat, 26 Nov 2011 - [555]
  • Intro on cement mixer, 26 Nov 2011 - [556]

Documentation

  • Documentation evolving, 7 Oct 2011 - [557]
  • Remote technical documentation strategy, 22 Oct 2011 - [558]