CEB Project Status

From Open Source Ecology
Revision as of 19:24, 5 February 2009 by WikiSysop (talk | contribs) (New page: *2.5.09- We have completed CEB Prototype 1 and tested it in the field. We now have a 3D design of the Torch Table, and will be buginning the build. Expected production date of CEB presses ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • 2.5.09- We have completed CEB Prototype 1 and tested it in the field. We now have a 3D design of the Torch Table, and will be buginning the build. Expected production date of CEB presses is May 1, 2009.