Sat Feb 10 2023 Notes

From Open Source Ecology
(Redirected from Build Finishing List)
Jump to: navigation, search

Build Items:

  1. Exterior trim + corners
  2. Door installation
  3. Siding

Done

  1. Foundation trim - 8 hr + 4 hrs = 11 hrs + 20 min rivets
  • Stairs
  • Landing
  • Canopy
  • Behind tub and behind stair sheet and insulation
  • Front porch
  • 2nd floor ceiling insulation
  • 2nd floor ceiling
  • Interior sill plates sketches on 2nd floor
  • Sill plates on first floor
  • Power center
  • Inverter
  • PV
  • Heat pump
  • Trellis


  • Interior frame, electrical, plumbing
  • Beadboard
  • Paint interior
  • Kitchen cabinets
  • Bathroom
  • Finish floor
  • Driveway
  • Sewer
  • Water
  • Power connection
  • Landscaping - tree spade etc

Design Items:

  • Garage driveway integration
  • Check.pngGarage deck
  • Build order doc - walls/insul/landing/stair/etc
  • Inverter
  • Power center and trenching
  • Canopy
  • Trellis
  • Overall garage top build order doc
  • Landscaping