PEM Fuel Cell Costs: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 July 2022

  • curprev 02:1002:10, 7 July 2022Marcin talk contribs 143 bytes +143 Created page with "*$20k for a 100kW cell stack. p.40. [https://www.energy.gov/sites/prod/files/2016/07/f33/fcto_battelle_mfg_cost_analysis_pp_chp_fc_systems.pdf]"