1000 House Modules Techniques

From Open Source Ecology
Revision as of 19:25, 24 December 2025 by Marcin (talk | contribs)
Jump to navigation Jump to search

Metal Roof and Siding

  • Take stack, predrill all holes on ridges. Saves 2-4x install time.
  • use green laser for horizontal lines.
  • Do every ridge, and 4' vertical distance

Cutting

  1. Set angle and depth of cordless circular saw for PV mount cuts
  2. Notch with a circular saw by doing multiple cuts then punching out the slabs
  3. Ultimate Grinder Wheel for many different jobs, but open source it
  4. jig saw a drum top with cut next to bung as close as possible.