How to Make a BOM: Difference between revisions
Jump to navigation
Jump to search
(→Links) |
No edit summary |
||
Line 1: | Line 1: | ||
=Introduction= | =Introduction= | ||
A complete BOM | A complete Bill of Materials (BOM) specifies parts/materials/resources needed for a build, and specifies where/how to get them. A formal BOM should include the following for each specified purchase item: | ||
#Quantity | #Quantity | ||
#Item description. Write down unique identifying properties. | #Item description. Write down unique identifying properties. | ||
#Link - direct link that takes one to arrive at description, source, or price (whenever available) | #Link - direct link that takes one to arrive at description, source, or price (whenever available) | ||
#AVL - Approved Vendor List - this defines what vendor the item can be purchased from. If a specific Link is provided, the AVL must also be filled out. This specifies what may be substituted. If it doesn't matter, write Open/Any. If a specific manufacturer is required, write down that specific manufacturer or distributor. The AVL may also be specified in the negative, such as - do not buy from Manufacturer X. | #AVL - Approved Vendor List - this defines what vendor the item can be purchased from. If a specific Link is provided above, the AVL must also be filled out. This specifies what may be substituted. If it doesn't matter, write Open/Any. If a specific manufacturer is required, write down that specific manufacturer or distributor. The AVL may also be specified in the negative, such as - do not buy from Manufacturer X. | ||
#AVL PN - Approved Vendor List Part Number - specify the manufacturer's or distributor's part number. | #AVL PN - Approved Vendor List Part Number - specify the manufacturer's or distributor's part number whenever possible. | ||
#MOQ - Minimum Order Quantity | #MOQ - Specify the Minimum Order Quantity | ||
#Lead Time - time to doorstep - or required from the placement or order to arrival of product at your doorstep. | #Lead Time - time to doorstep - or required from the placement or order to arrival of product at your doorstep. If shipping is not included, specify instructions for how to ship/pick up/deliver the item. | ||
#Price | #Price. Critical element for assessing cost to performance ratios of desired products. | ||
=Links= | =Links= | ||
*http://www.bunniestudios.com/blog/?p=2776 | *http://www.bunniestudios.com/blog/?p=2776 |
Revision as of 18:30, 24 July 2013
Introduction
A complete Bill of Materials (BOM) specifies parts/materials/resources needed for a build, and specifies where/how to get them. A formal BOM should include the following for each specified purchase item:
- Quantity
- Item description. Write down unique identifying properties.
- Link - direct link that takes one to arrive at description, source, or price (whenever available)
- AVL - Approved Vendor List - this defines what vendor the item can be purchased from. If a specific Link is provided above, the AVL must also be filled out. This specifies what may be substituted. If it doesn't matter, write Open/Any. If a specific manufacturer is required, write down that specific manufacturer or distributor. The AVL may also be specified in the negative, such as - do not buy from Manufacturer X.
- AVL PN - Approved Vendor List Part Number - specify the manufacturer's or distributor's part number whenever possible.
- MOQ - Specify the Minimum Order Quantity
- Lead Time - time to doorstep - or required from the placement or order to arrival of product at your doorstep. If shipping is not included, specify instructions for how to ship/pick up/deliver the item.
- Price. Critical element for assessing cost to performance ratios of desired products.