Solar Village 2010: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 7: Line 7:
*House-integrated CEB stove
*House-integrated CEB stove
*Thermaclear or Solexx glazing
*Thermaclear or Solexx glazing
*Structure similar to [[Image:Nicesolar.jpg|100px]]
*Structure similar to [[Image:Nicesolar.jpg|100px]] but solar cover extends from green roof
*Greenspace
*Greenspace
*Green roof
*Trellis for solar shade in summer
*Trellis for solar shade in summer
*Composting toilet
*Composting toilet
*CEB floor
*CEB floor
*Side space covered for rain and CEB water cistern
*Side space covered for rooftop rainwater catchment and CEB water cistern
*Planter in front and sides - zone 0 plantings in planter
*Planter in front and sides - zone 0 plantings in planter
*
 
=Steps=
#Site prep - flatten site with front loader and blade
 




[[Category:CEB Construction]][[Category:Solar Village]]
[[Category:CEB Construction]][[Category:Solar Village]]

Revision as of 21:19, 28 March 2010

Steps For Building a Solar Structure

Review of concept to date:

  • CEB walls
  • Straw bale infill between 2 wall cavities
  • House-integrated CEB stove
  • Thermaclear or Solexx glazing
  • Structure similar to Nicesolar.jpg but solar cover extends from green roof
  • Greenspace
  • Green roof
  • Trellis for solar shade in summer
  • Composting toilet
  • CEB floor
  • Side space covered for rooftop rainwater catchment and CEB water cistern
  • Planter in front and sides - zone 0 plantings in planter

Steps

  1. Site prep - flatten site with front loader and blade