2014-07-18 Friday:
2014-07-18 Friday:
------------------
------------------
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.
- 17:30-18:00: Visit to the Workshop.
  - 17:30-18:00: Visit to the Workshop.
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.


2014-07-19 Saturday:
2014-07-19 Saturday:
--------------------
--------------------
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code.  
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code.  
- 14:30-16:30: Coding the CEB Press microcontroller.
  - 14:30-16:30: Coding the CEB Press microcontroller.
- 16:30-17:30: Helping out to take out some sand.
  - 16:30-17:30: Helping out to take out some sand.
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.
-


2014-07-20 Sunday:
2014-07-20 Sunday:
--------------------
--------------------
- Resting day.
  - Resting day.


2014-07-21 Monday
2014-07-21 Monday
--------------------
--------------------
- Brick press team. Moving the head of the machine.
  - Brick press team. Moving the head of the machine.
- Grinding and welding during the whole afternoon.
  - Grinding and welding during the whole afternoon.
-


2014-07-22 Tuesday:
2014-07-22 Tuesday:
--------------------
--------------------
- Morning: Publicity team.
  - Morning: Publicity team.
- Afternoon: Workshop, handling steel bars for the Microhouse 3.
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.


2014-07-23 Wednesday:
2014-07-23 Wednesday:
--------------------
--------------------
- The whole day: bending bars for the Microhouse 3.
  - The whole day: bending bars for the Microhouse 3.
- Some welding practice.
  - Some welding practice.


2014-07-24 Thursday:
2014-07-24 Thursday:
--------------------
--------------------
- Morning: Moving soil for the Microhouse 3.
  - Morning: Moving soil for the Microhouse 3.
- Afternoon: Handling and measuring steel bars for the Microhouse.
  - Afternoon: Handling and measuring steel bars for the Microhouse.


2014-07-25 Friday:
2014-07-25 Friday:
- Morning: Moving soil for the Microhouse 3.  
  - Morning: Moving soil for the Microhouse 3.  
- Afternoon: Writting the next version for the CEB Press.
  - Afternoon: Writting the next version for the CEB Press.
Git repository: https://github.com/jaqm/Open-CEB-Press
'''Git repository: https://github.com/jaqm/Open-CEB-Press'''


2014-07-26 Saturday:
2014-07-26 Saturday:
- Resting day: relax, pool, more relax, some time writting code, more relax.
  - Resting day: relax, pool, more relax, some time writting code, more relax.


2014-07-27 Sunday:
2014-07-27 Sunday:
- The whole day: writting the firmware for the CEB Press.
  - The whole day: writting the firmware for the CEB Press.
- Helping to move steel bars from the workshop to the microhouse.
  - Helping to move steel bars from the workshop to the microhouse.


2014-07-28 Monday:
2014-07-28 Monday:
- Cleaning and reviewing the code for the CEB Press.
  - Cleaning and reviewing the code for the CEB Press.


2014-07-29 Tuesday:
2014-07-29 Tuesday:
* CEB Press firmware:
  * CEB Press firmware:
  - Review high pressure sensor flag support.
    - Review high pressure sensor flag support.
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
* Cutting wood and wires for the MicroHouse.
  * Cutting wood and wires for the MicroHouse.
* Dragging the pool to solve the licks.
  * Dragging the pool to solve the licks.


2014-07-30 Wednesday:
2014-07-30 Wednesday:
* CEB Press firmware:
  * CEB Press firmware:
  - going deep more into details of the auto-mode algorithm.
    - going deep more into details of the auto-mode algorithm.
* Fixing the licks of the pool.
  * Fixing the licks of the pool.


2014-07-31 Thursday:
2014-07-31 Thursday:
* Seeting up the testing CEB Press.
  * Seeting up the testing CEB Press.
* Pressing some bricks in the production Brick press.
  * Pressing some bricks in the production Brick press.


2014-08-01 Friday:
2014-08-01 Friday:

Revision as of 16:29, 26 August 2014

2014-07-16 (Wednesday):


 - 19:00: Arrival to MCI airport.
 - 21:00: Arrival to Factor eFarm.
 - 23:00: Sleep

2014-07-17 Thursday:


 - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.
 - 10:00: Teamwork to redesign the OSE documentation system.
 - 13:00: Video record to show the progress on documentation system.
 - 13:30: Lunch.
 - 14:30: Back to work. Made a power converter EU -> US.
 - 15:30: Continue with the redesign of the documentation and development system.
 - 19:20:
 - Adopting Trello for the DMAIC team.
 - Analyzing the existing documentation platform.
 - Setting up a infinoted test service, installing the gobby client, show it to the team.


2014-07-18 Friday:


 - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.
 - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.
 - 17:30-18:00: Visit to the Workshop.
 - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.

2014-07-19 Saturday:


 - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. 
 - 14:30-16:30: Coding the CEB Press microcontroller.
 - 16:30-17:30: Helping out to take out some sand.
 - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.

2014-07-20 Sunday:


 - Resting day.

2014-07-21 Monday


 - Brick press team. Moving the head of the machine.
 - Grinding and welding during the whole afternoon.

2014-07-22 Tuesday:


 - Morning: Publicity team.
 - Afternoon: Workshop, handling steel bars for the Microhouse 3.

2014-07-23 Wednesday:


 - The whole day: bending bars for the Microhouse 3.
 - Some welding practice.

2014-07-24 Thursday:


 - Morning: Moving soil for the Microhouse 3.
 - Afternoon: Handling and measuring steel bars for the Microhouse.

2014-07-25 Friday:

 - Morning: Moving soil for the Microhouse 3. 
 - Afternoon: Writting the next version for the CEB Press.

Git repository: https://github.com/jaqm/Open-CEB-Press

2014-07-26 Saturday:

 - Resting day: relax, pool, more relax, some time writting code, more relax.

2014-07-27 Sunday:

 - The whole day: writting the firmware for the CEB Press.
 - Helping to move steel bars from the workshop to the microhouse.

2014-07-28 Monday:

 - Cleaning and reviewing the code for the CEB Press.

2014-07-29 Tuesday:

 * CEB Press firmware:
   - Review high pressure sensor flag support.
   - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
 * Cutting wood and wires for the MicroHouse.
 * Dragging the pool to solve the licks.

2014-07-30 Wednesday:

 * CEB Press firmware:
   - going deep more into details of the auto-mode algorithm.
 * Fixing the licks of the pool.

2014-07-31 Thursday:

 * Seeting up the testing CEB Press.
 * Pressing some bricks in the production Brick press.

2014-08-01 Friday:


  • Built a picnic table.
  • Taking pictures of the Velocar workshop.

2014-08-02 Saturday:


  • Helping to print parts for the battery of the Velocar during the whole day and part of the evening.

2014-08-03 Sunday:


  • Baked some bread.

2014-08-04 Monday:


  • Cleaning/organizing the buckets at the workshop.
  • Moving pallets and pieces of wood to cut.
  • Moving soil for the brick press.

2014-08-05 Tuesday:


  • Mounting the rollers for the Brick Pressing "Factory".
  • Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!

2014-08-06 Wednesday:


  • Cutting, pressing, drilling bars for the doms.

2014-08-07 Thursday:


  • Mounting doms.
  • Preparing the Microhouse Workshop.

2014-08-08 Friday:


  • Microhouse workshop starts.

2014-08-09 Saturday:


  • Carpintery: building modules.
  • Pressing bricks.

2014-08-10 Sunday:


  • Carpintery: building modules.
  • Pressing bricks.

2014-08-11 Monday:


  • Laying bricks.

2014-08-12 Tuesday:


  • Last day of the workshop.

2014-08-13 Wednesday:


  • Day off.

2014-08-14 Thursday:


  • Day off.

2014-08-15 Friday:


  • Assembling a structure to cover the microhouse.
  • Making work the pool pump.

2014-08-16 Saturday:


  • Group meeting.

2014-08-17 Sunday:


  • Melting alluminium.
  • First test of the new firmware on the CEB Press.
  • Adding new features and solving bugs on the new CEB Press firmware.

2014-08-18 Monday:


  • Tuning and solving bugs on the new CEB Press firmware.
  • Cutting steel tubes.
  • Cutting aluminum.
  • Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.
  • Taking down the dom.

2014-08-19 Tuesday:


  • Uploading the pictures I took yesterday.
  • Searching contact info of similar organizations to OSE to improve social networking.
  • Replacing the saw of the bendsaw.

2014-08-20 Wednesday:


  • Cutting aluminum.
  • Fixing the 3D-Printer, started to print little pieces for its self-improvement.

2014-08-20 Thursday:


  • Moving some boards to the old workshop.
  • Filtering and uploading pictures to trovebox fo the powercube documentation.
  • Found a Raspberry Pi. Set it up and now it's working on the "wireless" network.
  • Fixing the Rbick Press. We didn't finished so we will tray again the next day if's possible.

2014-08-21 Friday:


  • Rainy day.
  • Fixed the test controller board. There was another pin that wasn't working.
  • Improving and fixing a bug in the new brick press code.
  • Fixing the brick press.
  • Covering the microhouse to protect it against rain.

2014-08-21 Saturday:


  • Fixing the brick press.

2014-08-22 Sunday:


  • Fixing the brick press. The teensy and the fuse are broken.
  • Order a new Teensy for the Brick Press.
  • I finally publish the worklog.

2014-08-23 Monday:


  • Assemblying the CEB Press testing machine.
  • Assemblying the Power Cube in progress.