Jose Antonio log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 197: | Line 197: | ||
- Setting up a infinoted test service, installing the gobby client, show it to the team. | - Setting up a infinoted test service, installing the gobby client, show it to the team. | ||
=2014-07-16 - | =2014-07-16 - Arrival= | ||
- 19:00: Arrival to MCI airport. | - 19:00: Arrival to MCI airport. | ||
- 21:00: Arrival to Factor eFarm. | - 21:00: Arrival to Factor eFarm. | ||
- 23:00: Sleep | - 23:00: Sleep |
Revision as of 05:50, 29 August 2014
Please post most recent entry on top
2014-08-25 Thursday
* Set up the CEB Press test machine. The solenoids are licking. * Group meeting.
2014-08-25 Wednesday
* Moving lumber to a better place. * Helping in the Power Cube v7 documentation. * Preparing the CEB Press test controller board.
2014-08-24 Tuesday
* Making work the 3D Printer. * Studying the steppers motors and stepper drivers used in the torch table. * Set up Infinoted on the Raspberry Pi that is running on the Wireless network at Factor eFarm.
2014-08-23 Monday
* Assemblying the CEB Press testing machine. * Assemblying the Power Cube in progress.
2014-08-22 Sunday
* Fixing the brick press. The teensy and the fuse are broken. * Order a new Teensy for the Brick Press. * I finally publish the worklog.
2014-08-21 Saturday
* Fixing the brick press.
2014-08-21 Friday
* Rainy day. * Fixed the test controller board. There was another pin that wasn't working. * Improving and fixing a bug in the new brick press code. * Fixing the brick press. * Covering the microhouse to protect it against rain.
2014-08-20 Thursday
* Moving some boards to the old workshop. * Filtering and uploading pictures to trovebox fo the powercube documentation. * Found a Raspberry Pi. Set it up and now it's working on the "wireless" network. * Fixing the Brick Press. We didn't finished so we will tray again the next day if's possible.
2014-08-20 Wednesday
* Cutting aluminum. * Fixing the 3D-Printer, started to print little pieces for its self-improvement.
2014-08-19 Tuesday
* Uploading the pictures I took yesterday. * Searching contact info of similar organizations to OSE to improve social networking. * Replacing the saw of the bendsaw.
2014-08-18 Monday
* Tuning and solving bugs on the new CEB Press firmware. * Cutting steel tubes. * Cutting aluminum. * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process. * Taking down a dom.
2014-08-17 Sunday
* Melting aluminum. * First test of the new firmware on the CEB Press. * Adding new features and solving bugs on the new CEB Press firmware.
2014-08-16 Saturday
* Group meeting.
2014-08-15 Friday
* Assembling a structure to cover the microhouse. * Making work the pool pump.
2014-08-14 Thursday
* Day off.
2014-08-13 Wednesday
* Day off.
2014-08-12 Tuesday
* Last day of the workshop.
2014-08-11 Monday
* Laying bricks.
Microhouse Workshop
2014-08-10 Sunday
* Carpintery: building modules for the Microhouse 3. * Pressing bricks.
2014-08-09 Saturday
* Carpintery: building modules. * Pressing bricks.
2014-08-08 Friday
* Microhouse workshop starts.
2014-08-07 Thursday
* Mounting doms. * Preparing the Microhouse Workshop.
2014-08-06 Wednesday
* Cutting, pressing, drilling bars for the doms.
2014-08-05 Tuesday
* Mounting the rollers for the Brick Pressing "Factory". * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!
2014-08-04 Monday
* Cleaning/organizing the buckets at the workshop. * Moving pallets and pieces of wood to cut. * Moving soil for the brick press.
Velocar Workshop
2014-08-03 Sunday
* Baked some bread.
2014-08-02 Saturday
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.
2014-08-01 Friday
* Built a picnic table. * Taking pictures of the Velocar workshop.
2014-07-31 Thursday
* Seeting up the testing CEB Press. * Pressing some bricks in the production Brick press.
2014-07-30 Wednesday
* CEB Press firmware: - going deep more into details of the auto-mode algorithm. * Fixing the licks of the pool.
2014-07-29 Tuesday
* CEB Press firmware: - Review high pressure sensor flag support. - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence. * Cutting wood and wires for the MicroHouse. * Dragging the pool to solve the licks.
2014-07-28 Monday
- Cleaning and reviewing the code for the CEB Press.
2014-07-27 Sunday
- The whole day: writting the firmware for the CEB Press. - Helping to move steel bars from the workshop to the microhouse.
2014-07-26 Saturday
- Resting day: relax, pool, more relax, some time writting code, more relax.
2014-07-25 Friday
- Morning: Moving soil for the Microhouse 3. - Afternoon: Writting the next version for the CEB Press.
Git repository: https://github.com/jaqm/Open-CEB-Press
2014-07-24 Thursday
- Morning: Moving soil for the Microhouse 3. - Afternoon: Handling and measuring steel bars for the Microhouse.
2014-07-23 Wednesday
- The whole day: bending bars for the Microhouse 3. - Some welding practice.
2014-07-22 Tuesday
- Morning: Publicity team. - Afternoon: Workshop, handling steel bars for the Microhouse 3.
2014-07-21 Monday
- Brick press team. Moving the head of the machine. - Grinding and welding during the whole afternoon.
2014-07-20 Sunday
- Resting day.
2014-07-19 Saturday
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. - 14:30-16:30: Coding the CEB Press microcontroller. - 16:30-17:30: Helping out to take out some sand. - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.
2014-07-18 Friday
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller. - 17:30-18:00: Visit to the Workshop. - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.
2014-07-17 - Thursday
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github. - 10:00: Teamwork to redesign the OSE documentation system. - 13:00: Video record to show the progress on documentation system. - 13:30: Lunch. - 14:30: Back to work. Made a power converter EU -> US. - 15:30: Continue with the redesign of the documentation and development system. - 19:20: - Adopting Trello for the DMAIC team. - Analyzing the existing documentation platform. - Setting up a infinoted test service, installing the gobby client, show it to the team.
2014-07-16 - Arrival
- 19:00: Arrival to MCI airport. - 21:00: Arrival to Factor eFarm. - 23:00: Sleep