Jose Antonio log: Difference between revisions
Jump to navigation
Jump to search
m (→2014-08-29) |
No edit summary |
||
Line 1: | Line 1: | ||
'''Please post most recent entry on top''' | '''Please post most recent entry on top''' | ||
=2014- | =2014-09-02 = | ||
* | |||
=2014-09-01 Monday= | |||
=2014-09-01= | * | ||
=2014-08-31= | =2014-08-31= | ||
* Simplifying the new CEB Press firmware. It's now ready for a new test. Improving the documentation within the code. | |||
=2014-08-30= | =2014-08-30= | ||
* | * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working. | ||
=2014-08-29= | =2014-08-29= | ||
Line 61: | Line 63: | ||
* Fixing the 3D-Printer, started to print little pieces for its self-improvement. | * Fixing the 3D-Printer, started to print little pieces for its self-improvement. | ||
=2014-08-19 | =2014-08-19= | ||
* Uploading the pictures I took yesterday. | * Uploading the pictures I took yesterday. | ||
* Searching contact info of similar organizations to OSE to improve social networking. | * Searching contact info of similar organizations to OSE to improve social networking. | ||
Line 73: | Line 75: | ||
* Taking down a dom. | * Taking down a dom. | ||
=2014-08-17 | =2014-08-17= | ||
* Melting aluminum. | * Melting aluminum. | ||
* First test of the new firmware on the CEB Press. | * First test of the new firmware on the CEB Press. | ||
* Adding new features and solving bugs on the new CEB Press firmware. | * Adding new features and solving bugs on the new CEB Press firmware. | ||
=2014-08-16 | =2014-08-16= | ||
* Group meeting. | * Group meeting. | ||
=2014-08-15 | =2014-08-15= | ||
* Assembling a structure to cover the microhouse. | * Assembling a structure to cover the microhouse. | ||
* Making work the pool pump. | * Making work the pool pump. | ||
=2014-08-14 | =2014-08-14= | ||
* Day off. | * Day off. | ||
=2014-08-13 | =2014-08-13= | ||
* Day off. | * Day off. | ||
==2014-08-12 | ==2014-08-12== | ||
* Last day of the workshop. | * Last day of the workshop. | ||
Line 99: | Line 101: | ||
=Microhouse Workshop= | =Microhouse Workshop= | ||
==2014-08-10 | ==2014-08-10== | ||
* Carpintery: building modules for the Microhouse 3. | * Carpintery: building modules for the Microhouse 3. | ||
* Pressing bricks. | * Pressing bricks. | ||
==2014-08-09 | ==2014-08-09== | ||
* Carpintery: building modules. | * Carpintery: building modules. | ||
* Pressing bricks. | * Pressing bricks. | ||
==2014-08-08 | ==2014-08-08== | ||
* Microhouse workshop starts. | * Microhouse workshop starts. | ||
=2014-08-07 | =2014-08-07= | ||
* Mounting doms. | * Mounting doms. | ||
* Preparing the Microhouse Workshop. | * Preparing the Microhouse Workshop. | ||
=2014-08-06 | =2014-08-06= | ||
* Cutting, pressing, drilling bars for the doms. | * Cutting, pressing, drilling bars for the doms. | ||
=2014-08-05 | =2014-08-05= | ||
* Mounting the rollers for the Brick Pressing "Factory". | * Mounting the rollers for the Brick Pressing "Factory". | ||
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise! | * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise! | ||
Line 127: | Line 129: | ||
= Velocar Workshop= | = Velocar Workshop= | ||
==2014-08-03 | ==2014-08-03== | ||
* Baked some bread. | * Baked some bread. | ||
==2014-08-02 | ==2014-08-02== | ||
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening. | * Helping to print parts for the battery of the Velocar during the whole day and part of the evening. | ||
==2014-08-01 | ==2014-08-01== | ||
* Built a picnic table. | * Built a picnic table. | ||
* Taking pictures of the Velocar workshop. | * Taking pictures of the Velocar workshop. | ||
=2014-07-31 | =2014-07-31= | ||
* Seeting up the testing CEB Press. | * Seeting up the testing CEB Press. | ||
* Pressing some bricks in the production Brick press. | * Pressing some bricks in the production Brick press. | ||
=2014-07-30 | =2014-07-30= | ||
* CEB Press firmware: | * CEB Press firmware: | ||
- going deep more into details of the auto-mode algorithm. | - going deep more into details of the auto-mode algorithm. | ||
* Fixing the licks of the pool. | * Fixing the licks of the pool. | ||
=2014-07-29 | =2014-07-29= | ||
* CEB Press firmware: | * CEB Press firmware: | ||
- Review high pressure sensor flag support. | - Review high pressure sensor flag support. | ||
Line 156: | Line 158: | ||
- Cleaning and reviewing the code for the CEB Press. | - Cleaning and reviewing the code for the CEB Press. | ||
=2014-07-27 | =2014-07-27= | ||
- The whole day: | - The whole day: writing the firmware for the CEB Press. | ||
- Helping to move steel bars from the workshop to the microhouse. | - Helping to move steel bars from the workshop to the microhouse. | ||
=2014-07-26 | =2014-07-26= | ||
- Resting day: relax, pool, more relax, some time writting code, more relax. | - Resting day: relax, pool, more relax, some time writting code, more relax. | ||
=2014-07-25 | =2014-07-25= | ||
- Morning: Moving soil for the Microhouse 3. | - Morning: Moving soil for the Microhouse 3. | ||
- Afternoon: Writting the next version for the CEB Press. | - Afternoon: Writting the next version for the CEB Press. | ||
'''Git repository: https://github.com/jaqm/Open-CEB-Press''' | '''Git repository: https://github.com/jaqm/Open-CEB-Press''' | ||
=2014-07-24 | =2014-07-24= | ||
- Morning: Moving soil for the Microhouse 3. | - Morning: Moving soil for the Microhouse 3. | ||
- Afternoon: Handling and measuring steel bars for the Microhouse. | - Afternoon: Handling and measuring steel bars for the Microhouse. | ||
=2014-07-23 | =2014-07-23= | ||
- The whole day: bending bars for the Microhouse 3. | - The whole day: bending bars for the Microhouse 3. | ||
- Some welding practice. | - Some welding practice. | ||
=2014-07-22 | =2014-07-22= | ||
- Morning: Publicity team. | - Morning: Publicity team. | ||
- Afternoon: Workshop, handling steel bars for the Microhouse 3. | - Afternoon: Workshop, handling steel bars for the Microhouse 3. | ||
Line 184: | Line 186: | ||
- Grinding and welding during the whole afternoon. | - Grinding and welding during the whole afternoon. | ||
=2014-07-20 | =2014-07-20= | ||
- Resting day. | - Resting day. | ||
=2014-07-19 | =2014-07-19= | ||
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. | - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. | ||
- 14:30-16:30: Coding the CEB Press microcontroller. | - 14:30-16:30: Coding the CEB Press microcontroller. | ||
Line 193: | Line 195: | ||
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller. | - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller. | ||
=2014-07-18 | =2014-07-18= | ||
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. | - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. | ||
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller. | - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller. | ||
Line 199: | Line 201: | ||
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece. | - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece. | ||
=2014-07-17 | =2014-07-17= | ||
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github. | - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github. | ||
- 10:00: Teamwork to redesign the OSE documentation system. | - 10:00: Teamwork to redesign the OSE documentation system. |
Revision as of 02:41, 1 September 2014
Please post most recent entry on top
2014-09-02
*
2014-09-01 Monday
*
2014-08-31
* Simplifying the new CEB Press firmware. It's now ready for a new test. Improving the documentation within the code.
2014-08-30
* Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.
2014-08-29
* Assemblying the power cube v7 and taking pictures. * Repairing the CEB Press test machine solenoids. * Running the CEB Press, first day testing the new code on a real machine. * Writing the new CEB Press firmware.
2014-08-28
* Set up the CEB Press test machine. The solenoids are licking. * Group meeting.
2014-08-27
* Moving lumber to a better place. * Helping in the Power Cube v7 documentation. * Preparing the CEB Press test controller board.
2014-08-26
* Making work the 3D Printer. * Studying the steppers motors and stepper drivers used in the torch table. * Set up Infinoted on the Raspberry Pi that is running on the Wireless network at Factor eFarm.
2014-08-25 Monday
* Assemblying the CEB Press testing machine. * Assemblying the Power Cube in progress.
2014-08-24
* Fixing the brick press. The teensy and the fuse are broken. * Order a new Teensy for the Brick Press. * I finally publish the worklog.
2014-08-23
* Fixing the brick press.
2014-08-22
* Rainy day. * Fixed the test controller board. There was another pin that wasn't working. * Improving and fixing a bug in the new brick press code. * Fixing the brick press. * Covering the microhouse to protect it against rain.
2014-08-21
* Moving some boards to the old workshop. * Filtering and uploading pictures to trovebox fo the powercube documentation. * Found a Raspberry Pi. Set it up and now it's working on the "wireless" network. * Fixing the Brick Press. We didn't finished so we will tray again the next day if's possible.
2014-08-20
* Cutting aluminum. * Fixing the 3D-Printer, started to print little pieces for its self-improvement.
2014-08-19
* Uploading the pictures I took yesterday. * Searching contact info of similar organizations to OSE to improve social networking. * Replacing the saw of the bendsaw.
2014-08-18 Monday
* Tuning and solving bugs on the new CEB Press firmware. * Cutting steel tubes. * Cutting aluminum. * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process. * Taking down a dom.
2014-08-17
* Melting aluminum. * First test of the new firmware on the CEB Press. * Adding new features and solving bugs on the new CEB Press firmware.
2014-08-16
* Group meeting.
2014-08-15
* Assembling a structure to cover the microhouse. * Making work the pool pump.
2014-08-14
* Day off.
2014-08-13
* Day off.
2014-08-12
* Last day of the workshop.
2014-08-11 Monday
* Laying bricks.
Microhouse Workshop
2014-08-10
* Carpintery: building modules for the Microhouse 3. * Pressing bricks.
2014-08-09
* Carpintery: building modules. * Pressing bricks.
2014-08-08
* Microhouse workshop starts.
2014-08-07
* Mounting doms. * Preparing the Microhouse Workshop.
2014-08-06
* Cutting, pressing, drilling bars for the doms.
2014-08-05
* Mounting the rollers for the Brick Pressing "Factory". * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!
2014-08-04 Monday
* Cleaning/organizing the buckets at the workshop. * Moving pallets and pieces of wood to cut. * Moving soil for the brick press.
Velocar Workshop
2014-08-03
* Baked some bread.
2014-08-02
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.
2014-08-01
* Built a picnic table. * Taking pictures of the Velocar workshop.
2014-07-31
* Seeting up the testing CEB Press. * Pressing some bricks in the production Brick press.
2014-07-30
* CEB Press firmware: - going deep more into details of the auto-mode algorithm. * Fixing the licks of the pool.
2014-07-29
* CEB Press firmware: - Review high pressure sensor flag support. - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence. * Cutting wood and wires for the MicroHouse. * Dragging the pool to solve the licks.
2014-07-28 Monday
- Cleaning and reviewing the code for the CEB Press.
2014-07-27
- The whole day: writing the firmware for the CEB Press. - Helping to move steel bars from the workshop to the microhouse.
2014-07-26
- Resting day: relax, pool, more relax, some time writting code, more relax.
2014-07-25
- Morning: Moving soil for the Microhouse 3. - Afternoon: Writting the next version for the CEB Press.
Git repository: https://github.com/jaqm/Open-CEB-Press
2014-07-24
- Morning: Moving soil for the Microhouse 3. - Afternoon: Handling and measuring steel bars for the Microhouse.
2014-07-23
- The whole day: bending bars for the Microhouse 3. - Some welding practice.
2014-07-22
- Morning: Publicity team. - Afternoon: Workshop, handling steel bars for the Microhouse 3.
2014-07-21 Monday
- Brick press team. Moving the head of the machine. - Grinding and welding during the whole afternoon.
2014-07-20
- Resting day.
2014-07-19
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. - 14:30-16:30: Coding the CEB Press microcontroller. - 16:30-17:30: Helping out to take out some sand. - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.
2014-07-18
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller. - 17:30-18:00: Visit to the Workshop. - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.
2014-07-17
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github. - 10:00: Teamwork to redesign the OSE documentation system. - 13:00: Video record to show the progress on documentation system. - 13:30: Lunch. - 14:30: Back to work. Made a power converter EU -> US. - 15:30: Continue with the redesign of the documentation and development system. - 19:20: - Adopting Trello for the DMAIC team. - Analyzing the existing documentation platform. - Setting up a infinoted test service, installing the gobby client, show it to the team.
2014-07-16 - Arrival
- 19:00: Arrival to MCI airport. - 21:00: Arrival to Factor eFarm. - 23:00: Sleep