=Requirement= | |||
*1' wide stem wall | |||
*Shallow insulated footer | |||
*2"x10" forms | |||
*Stands 1-2" above floor | |||
*Includes concrete pad for [[Hydronic Stove]] and for bathroom | |||
*Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks | |||
*Foundation plan facilitates installation of CEB floor | |||
*Foundation plan facilitates installation of hydronic heating | |||
*Foundation plan facilitates installation of water and power lines in perimeter of floor | |||
*Makes provisions for extension of foundation on corners - via stubbing out of rebar | |||
<html><iframe src="https://docs.google.com/presentation/d/1JPAPZ-aQlmIyJKuo-oaJpedSHI3yzSOeFic4TItn5d0/embed?start=false&loop=false&delayms=3000" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> |
Latest revision as of 16:42, 7 September 2014
Requirement
- 1' wide stem wall
- Shallow insulated footer
- 2"x10" forms
- Stands 1-2" above floor
- Includes concrete pad for Hydronic Stove and for bathroom
- Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks
- Foundation plan facilitates installation of CEB floor
- Foundation plan facilitates installation of hydronic heating
- Foundation plan facilitates installation of water and power lines in perimeter of floor
- Makes provisions for extension of foundation on corners - via stubbing out of rebar