Top Roof Section Module Build Instructions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
=Script= | |||
#Cut 16' long members to 16' exactly. | |||
#Mark location of purlins 4' on center | |||
#Cut 4 purlins and 2 end caps for roof frame - fitted between long 16' members so that the panel is 3' wide. Note that we are not using plywood here. | |||
#Screw 2 long members and 2 end caps together using [3] 3" screws | |||
#Screw in purlins at marked locations | |||
#Invert | |||
=Visual Animation in Sketchup= | =Visual Animation in Sketchup= | ||
Revision as of 04:21, 21 September 2014
Script
- Cut 16' long members to 16' exactly.
- Mark location of purlins 4' on center
- Cut 4 purlins and 2 end caps for roof frame - fitted between long 16' members so that the panel is 3' wide. Note that we are not using plywood here.
- Screw 2 long members and 2 end caps together using [3] 3" screws
- Screw in purlins at marked locations
- Invert
Visual Animation in Sketchup
See scenes in this Sketchup animation.
Download file - File:Toproofbuild.skp (uses wiki version control)
Warehouse version -may not be updated - Warehouse has no versioning: