Top Roof Section Module Build Instructions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
#Cut 16' long members to 16' exactly. | #Cut 16' long members to 16' exactly. | ||
#Mark location of purlins 4' on center | #Mark location of purlins 4' on center | ||
#Cut 4 purlins and 2 end caps for roof frame - fitted between long 16' members so that the panel is 3' wide. Note that we are not using plywood here. | #Cut 4 purlins and 2 end caps for roof frame - fitted between long 16' members so that the panel is 3' wide. Note that we are not using plywood here. | ||
#Screw 2 long members and 2 end caps together using [3] 3" screws | #Screw 2 long members and 2 end caps together using [3] 3" screws | ||
#Screw in purlins at marked locations | #Screw in purlins at marked locations | ||
#Invert | #Invert on sawhorses and staple tyvek base layer upon which insulation will sit | ||
#Re-invert to right-side-up and insert insulation | |||
#Cover the top of panel with Tyvek as a moisture barrier under metal roofing. Note: do not install metal roofing - it is not possible to line up the seams this way, so roof metal goes on last. | |||
=Tools and Materials= | |||
*3/8" Stapler | |||
*Miter saw | |||
*Pencil | |||
*Metal roofing screws (for install) | |||
*Tyvek | |||
*2x6s | |||
*Roof metal - (after roof is in place) | |||
*Flashing - (after roof is in place) | |||
*Roof metal ridge seal foam | |||
*Insulation | |||
*Pro-Rib vented seal - ? - [http://www.menards.com/main/building-materials/pole-barn-post-frame-materials/tools-accessories/pro-rib-vented-closure-4-panels/p-1808123-c-5713.htm] | |||
*Pro-Rib outside closure - [http://www.menards.com/main/building-materials/pole-barn-post-frame-materials/tools-accessories/pro-rib-outside-closure-4-pack/p-1808125-c-5713.htm] | |||
*Pro-Rib inside closure - [http://www.menards.com/main/building-materials/pole-barn-post-frame-materials/tools-accessories/pro-rib-reg-inside-closure-4-pack/p-1808126-c-5713.htm] | |||
=Visual Animation in Sketchup= | =Visual Animation in Sketchup= |
Latest revision as of 04:34, 21 September 2014
Script
- Cut 16' long members to 16' exactly.
- Mark location of purlins 4' on center
- Cut 4 purlins and 2 end caps for roof frame - fitted between long 16' members so that the panel is 3' wide. Note that we are not using plywood here.
- Screw 2 long members and 2 end caps together using [3] 3" screws
- Screw in purlins at marked locations
- Invert on sawhorses and staple tyvek base layer upon which insulation will sit
- Re-invert to right-side-up and insert insulation
- Cover the top of panel with Tyvek as a moisture barrier under metal roofing. Note: do not install metal roofing - it is not possible to line up the seams this way, so roof metal goes on last.
Tools and Materials
- 3/8" Stapler
- Miter saw
- Pencil
- Metal roofing screws (for install)
- Tyvek
- 2x6s
- Roof metal - (after roof is in place)
- Flashing - (after roof is in place)
- Roof metal ridge seal foam
- Insulation
- Pro-Rib vented seal - ? - [1]
- Pro-Rib outside closure - [2]
- Pro-Rib inside closure - [3]
Visual Animation in Sketchup
See scenes in this Sketchup animation.
Download file - File:Toproofbuild.skp (uses wiki version control)
Warehouse version -may not be updated - Warehouse has no versioning: