Business Plan 2015: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
*Timeline | *Timeline | ||
*GVCS value proposition as a package towards solving pressing issues, technical strategy for sequencing, release schedule | *GVCS value proposition as a package towards solving pressing issues, technical strategy for sequencing, release schedule | ||
:*Hardware: construction set | |||
: | |||
*Development Protocol | *Development Protocol | ||
:*Zachman framework - at different levels | |||
:*XM | |||
:*Flashy XM - swarming |
Revision as of 00:13, 8 December 2014
- Values and Specifications
- 2014 Transition to Service Earning
- Proofs of Concept Achieved
- University Model and Scaling (ref to 2013 plan)
- Basic economic analysis and projections
- Extreme Manufacturing Model and Extreme Learning (ref to. Google talk)
- curriculum
- Timeline
- GVCS value proposition as a package towards solving pressing issues, technical strategy for sequencing, release schedule
- Hardware: construction set
- Development Protocol
- Zachman framework - at different levels
- XM
- Flashy XM - swarming