Planning Notes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
*Jan 31 - Open Source Thesis defense. | *Jan 31 - Open Source Thesis defense. | ||
*Need to install backup electric water heater. | *Need to install backup electric water heater. | ||
*Daily ablutions for MicroHouse 4 - | *Daily ablutions for MicroHouse 4 - |
Revision as of 17:07, 15 December 2014
- Jan 31 - Open Source Thesis defense.
- Need to install backup electric water heater.
- Daily ablutions for MicroHouse 4 -
Monday
- Leave at 5 PM for OSE 940 resend
- After meeting - Shelf, coat hangers, and baseboard put; lamp + water filter asessment
- 8-10 - Fix the Awning and cover the insulation
Tuesday
- Agriculture visit at 2:00 PM
- Take down all stuff to workshop, get books and other supplies from Huts, and fix leak in MH1 sink
Wednesday
- Fix loft height adjustment and floor cutout for expansion
Thursday-Sat
- Keep cleaning outside - finish everything else