Aquaponic Greenhouse Financial Analysis: Difference between revisions
Jump to navigation
Jump to search
(Created page with "The experimental build cost is [https://docs.google.com/spreadsheets/d/1V_K_v6c9-CZmkgtG1jvgUAGDpRGN5QNDrh26XYiEvB0/edit#gid=0&vpid=A1]") |
No edit summary |
||
Line 1: | Line 1: | ||
The total cost includes event costs, additional purchases, changes, prototyping costs, waste not used, and any other costs. It is not representative of a build cost where the product is not a prototype, but a finished product - and limited waste is involved. | |||
The experimental build cost is [https://docs.google.com/spreadsheets/d/1V_K_v6c9-CZmkgtG1jvgUAGDpRGN5QNDrh26XYiEvB0/edit#gid=0&vpid=A1] | The experimental build cost is [https://docs.google.com/spreadsheets/d/1V_K_v6c9-CZmkgtG1jvgUAGDpRGN5QNDrh26XYiEvB0/edit#gid=0&vpid=A1] |
Latest revision as of 22:54, 2 December 2015
The total cost includes event costs, additional purchases, changes, prototyping costs, waste not used, and any other costs. It is not representative of a build cost where the product is not a prototype, but a finished product - and limited waste is involved.
The experimental build cost is [1]