Aquaponic Greenhouse Financial Analysis: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "The experimental build cost is [https://docs.google.com/spreadsheets/d/1V_K_v6c9-CZmkgtG1jvgUAGDpRGN5QNDrh26XYiEvB0/edit#gid=0&vpid=A1]")
 
No edit summary
 
Line 1: Line 1:
The total cost includes event costs, additional purchases, changes, prototyping costs, waste not used, and any other costs. It is not representative of a build cost where the product is not a prototype, but a finished product - and limited waste is involved.
The experimental build cost is [https://docs.google.com/spreadsheets/d/1V_K_v6c9-CZmkgtG1jvgUAGDpRGN5QNDrh26XYiEvB0/edit#gid=0&vpid=A1]
The experimental build cost is [https://docs.google.com/spreadsheets/d/1V_K_v6c9-CZmkgtG1jvgUAGDpRGN5QNDrh26XYiEvB0/edit#gid=0&vpid=A1]

Latest revision as of 22:54, 2 December 2015

The total cost includes event costs, additional purchases, changes, prototyping costs, waste not used, and any other costs. It is not representative of a build cost where the product is not a prototype, but a finished product - and limited waste is involved.

The experimental build cost is [1]