Israel Log: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (Created page with "= Wed, April 6, 2016 =  * Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.") | |||
| Line 1: | Line 1: | ||
| = Mon, April 11, 2016 = | |||
| * Wrote Seattle Buid Group description | |||
| https://www.google.com/url?q=https%3A%2F%2Fwww.dropbox.com%2Fs%2F2tx7s4tc9rowmgr%2Fsxg.html%3Fdl%3D0&sa=D&sntz=1&usg=AFQjCNG9LT5pA6cjm1n5mLg-vL2f5HLjFw | |||
| = Wed, April 6, 2016 = | = Wed, April 6, 2016 = | ||
| * Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more. | * Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more. | ||
Revision as of 23:30, 11 April 2016
Mon, April 11, 2016
- Wrote Seattle Buid Group description
Wed, April 6, 2016
- Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.