8/18/2011
Erected posts and poured concrete for new mill shed beside workshop.
8/20
Moved felled logs to stack behind mill shed. Spread old CEB across ground for new shop. Began clearing land with new box blade.
8/21
Cleared out felled walnut tree, deposited branches near wood chipper in orchard. Put usable walnut wood in a pile behind mill shed
8/22
Began pulling box blade across land for new shop.
Broke box blade flange on left-hand driver side, Tom re-attached with a fitted flange w/smaller bolt hole.
Cleared more land, then broke flange on right-hand driver side. Parked tractor and went to meeting. Land >60% cleared of biomass.