CEB Press/Manufacturing Instructions/Controller Box/FeF Liberator Controller: Difference between revisions
Jump to navigation
Jump to search
(→Step 2) |
(→Step 2) |
||
Line 25: | Line 25: | ||
*House wiring box (blue box in picture above below the Arduino Shield - hardware store | *House wiring box (blue box in picture above below the Arduino Shield - hardware store | ||
*Fuse holder - car parts store | *Fuse holder - car parts store | ||
*12v quick connect plugs - 5 pairs - for quick-coupling to solenoids out of controller box - car parts store | |||
* | * |
Revision as of 21:00, 16 October 2010
Step 1
- Source 7/16" thick, 6" wide u-channel: 20 feet of it.
- Pieces needed: (click on image to enlarge)
- Torch or cold-cut channel to size
- Punch holes
Step 2
Source the electronics. Here is a diagram of the controller box
Here is the complete controller installed:
- Electronics Box - local hardware store
- Extension Cord
- Or house wiring with Female Plug and Male Plug.
- House wiring box (blue box in picture above below the Arduino Shield - hardware store
- Fuse holder - car parts store
- 12v quick connect plugs - 5 pairs - for quick-coupling to solenoids out of controller box - car parts store