Jasonshah log: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				 (Added {{RightTOC}})  | 
				||
| (19 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{RightTOC}}  | |||
[[Category:Logs]]  | |||
= Fri June6, 2014=  | |||
*Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press.  | |||
<html> <iframe src="https://docs.google.com/presentation/d/1Ckd_mKM8rnVmgQFget9SvhTd-FyEm_2F_5MaJKQkn3U/embed?start=false&loop=false&delayms=3000" frameborder="0" width="600" height="450" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html>  | |||
=Thurs June 5, 2014=  | |||
*Ongoing work on the Google presentation on the instructional of the Secondary Cylinder Assembly, CEB 6 Press.  | |||
* Swarmed with the summer team in the organization efforts at the Workshop.  | |||
* Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop.  | |||
* Assisted in moving materials for the raised beds infront of Hablab.  | |||
<html> <a href="https://opensourceecology.trovebox.com/p/4mr/token-faa30b11b5">  | |||
  <img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/IMG_0012-666ca8_800x800.jpg" width="400" height="300">  | |||
</a> </html>  | |||
=Wed June 4, 2014=  | |||
*Started the work on instructional for the Secondary Cylinder Assembly of the CEB 6 Press  | |||
[[File:CEB 6 Press_Sec Cylinder Assembly.fcstd]]  | |||
* Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision.  | |||
<html> <a href="https://opensourceecology.trovebox.com/p/4lb/token-4419a274d9">  | |||
  <img src="http://d1odebs29o9vbg.cloudfront.net/custom/201406/91AA4C4E-7A79-426C-869D-13F386F8F933-50e924_800x800.jpg" width="400" height="300">  | |||
</a> </html>  | |||
=Tues June 3, 2014=  | |||
* Learned about several functions for operation of FreeCAD.   | |||
*Coordinated the workshop area for access to Power Machines and Hydraulics units.  | |||
*Worked with a group to assemble the CEB 6 Press; partial assembly accomplished but confusion with the general outlay of the machine.  | |||
=Mon June 2, 2014=  | |||
*Morning session: Learning about features in the OSE Collaboration Architecture  | |||
*Build session: Built a 4' * 8' prototype for a panel. Used 2" * 4" wooden beams and screws. These panels can be used for walls, decks. For info go to, [[chrisc_log]]  | |||
*Assisted in the Agricultural Plantout  | |||
=June 1, 2014=  | =June 1, 2014=  | ||
*  | *Arrived on Factor e Farm Campus. Orientation with the summer team.  | ||
Latest revision as of 13:58, 3 December 2016
Fri June6, 2014
- Completed the instructional for Secondary Cylinder Assembly of the CEB 6 Press.
 
Thurs June 5, 2014
- Ongoing work on the Google presentation on the instructional of the Secondary Cylinder Assembly, CEB 6 Press.
 - Swarmed with the summer team in the organization efforts at the Workshop.
 - Learned about the use of angle grinders and welding operations. Welded wheels to create a mobile steel worktable inside the workshop.
 - Assisted in moving materials for the raised beds infront of Hablab.
 
Wed June 4, 2014
- Started the work on instructional for the Secondary Cylinder Assembly of the CEB 6 Press
 
File:CEB 6 Press Sec Cylinder Assembly.fcstd
- Completed the assembly of a prototype CEB Press with three other collaborators and under Marcin's supervision.
 
Tues June 3, 2014
- Learned about several functions for operation of FreeCAD.
 - Coordinated the workshop area for access to Power Machines and Hydraulics units.
 - Worked with a group to assemble the CEB 6 Press; partial assembly accomplished but confusion with the general outlay of the machine.
 
Mon June 2, 2014
- Morning session: Learning about features in the OSE Collaboration Architecture
 - Build session: Built a 4' * 8' prototype for a panel. Used 2" * 4" wooden beams and screws. These panels can be used for walls, decks. For info go to, chrisc_log
 - Assisted in the Agricultural Plantout
 
June 1, 2014
- Arrived on Factor e Farm Campus. Orientation with the summer team.