D3D 1612 Quality Control: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=Quality Control Introduction= Quality control should occur during initial materials preparation, during the Extreme Build, and a final check once the entire machine is assem...") |
(No difference)
|
Latest revision as of 22:33, 11 January 2018
Quality Control Introduction
Quality control should occur during initial materials preparation, during the Extreme Build, and a final check once the entire machine is assembled together. This is an exhaustive list of steps, after which the machine must work.