D3D Development Log: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=Mon May 22, 2018= Next steps: *Prove quick-set epoxy method of printer assembly *Validate frame assembly from welded bar *Validate card reader + LCD *Validate USA Titan Aero...") |
|||
Line 14: | Line 14: | ||
*Validate Volcano cooling fan assembly + sensor mount | *Validate Volcano cooling fan assembly + sensor mount | ||
*Validate insulation mounting of bed. | *Validate insulation mounting of bed. | ||
*Validate bottom insulation of bed |
Revision as of 20:00, 21 May 2018
Mon May 22, 2018
Next steps:
- Prove quick-set epoxy method of printer assembly
- Validate frame assembly from welded bar
- Validate card reader + LCD
- Validate USA Titan Aero Volcano
- Validate China Titan Aero Volcano
- Validate Plexiglas electronics mounting
- Validate DIY heater beds with steel
- Validate DIY heater beds with aluminum
- Validate double sided adhesion of bed surface
- Validate Trinamic driver quiet operation
- Validate sensorless endstop operation with Trinamic drivers
- Validate Volcano cooling fan assembly + sensor mount
- Validate insulation mounting of bed.
- Validate bottom insulation of bed