D3D Development Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "=Mon May 22, 2018= Next steps: *Prove quick-set epoxy method of printer assembly *Validate frame assembly from welded bar *Validate card reader + LCD *Validate USA Titan Aero...")
 
Line 14: Line 14:
*Validate Volcano cooling fan assembly + sensor mount
*Validate Volcano cooling fan assembly + sensor mount
*Validate insulation mounting of bed.
*Validate insulation mounting of bed.
*Validate bottom insulation of bed

Revision as of 20:00, 21 May 2018

Mon May 22, 2018

Next steps:

  • Prove quick-set epoxy method of printer assembly
  • Validate frame assembly from welded bar
  • Validate card reader + LCD
  • Validate USA Titan Aero Volcano
  • Validate China Titan Aero Volcano
  • Validate Plexiglas electronics mounting
  • Validate DIY heater beds with steel
  • Validate DIY heater beds with aluminum
  • Validate double sided adhesion of bed surface
  • Validate Trinamic driver quiet operation
  • Validate sensorless endstop operation with Trinamic drivers
  • Validate Volcano cooling fan assembly + sensor mount
  • Validate insulation mounting of bed.
  • Validate bottom insulation of bed