Sara Kit Certification: Difference between revisions
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
<html><iframe src="https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fmarcin.jakubowski.378%2Fposts%2F10214935833086481&width=500" width="500" height="378" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowTransparency="true" allow="encrypted-media"></iframe></html> | <html><iframe src="https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fmarcin.jakubowski.378%2Fposts%2F10214935833086481&width=500" width="500" height="378" style="border:none;overflow:hidden" scrolling="no" frameborder="0" allowTransparency="true" allow="encrypted-media"></iframe></html> | ||
==Time Lapse== | |||
One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours. | |||
==Time Log== | |||
==Issues== | |||
==Evaluation== | |||
Overall kit evaluation is this based on [[Kit Certification#Evaluation]] | |||
=Comments and Improvements= | =Comments and Improvements= |
Revision as of 22:56, 14 November 2018
Build Space
Make a copy of:
Main Checklist
Electronics Checklist
Build
Kit Build
Time Lapse
One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours.
Time Log
Issues
Evaluation
Overall kit evaluation is this based on Kit Certification#Evaluation
Comments and Improvements
Links
- Kit Certification
- Current Material inventory - [1]
- 3D Printer Logs - for parts production