Sara Kit Certification: Difference between revisions
Jump to navigation
Jump to search
Line 41: | Line 41: | ||
Overall kit evaluation is this based on [[Kit Certification#Evaluation]] | Overall kit evaluation is this based on [[Kit Certification#Evaluation]] | ||
=Comments and Improvements= | =Sara Comments and Improvements= | ||
=Links= | =Links= |
Revision as of 22:57, 14 November 2018
Build Space
Make a copy of:
Main Checklist
Electronics Checklist
Build
Kit Build
Time Lapse
One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours.
Time Log
Issues
Evaluation
Overall kit evaluation is this based on Kit Certification#Evaluation
Sara Comments and Improvements
Links
- Kit Certification
- Current Material inventory - [1]
- 3D Printer Logs - for parts production