Sara Kit Certification: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 62: Line 62:
#20:21 - X axis mounted - Time: '''11'''
#20:21 - X axis mounted - Time: '''11'''
#
#
==Tips and Tricks==
#To level print bed for mounting - press down all the way until the bed mounting idlers both rest on the frame - thereby using the frame to determine a perfect parallel to the ground.


==Issues Log==
==Issues Log==

Revision as of 23:47, 14 November 2018

Build Space

Make a copy of:

edit

Main Checklist

edit

Electronics Checklist

edit

Build

edit


Kit Build

Time Lapse

One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours.

Time Log

And comments. Time is in minutes. Negative sign - time to be subtracted and added to the Kit Prep phase, not Build Phase. Total time of build does not include negative times.

  1. 15:42 - Start. Unpack. Weld frame. Set up camera. Includes going from house to workshop. Time: Frame: 37-
  2. 16:19 - Axis assembly start. Y + Z rear. Missing tool: tape spacer. Time: 7
  3. 16:26 - Error warning: set screw allen wrench short side wore out mid way. Got another one. Time: -2
  4. 16:28-16:34 - Cleaning out idler pieces . Time: -7
  5. 16:35 - Tape on bearings. Not needed in practice. Time: -3
  6. 16:39 - Finished bearing insertion for all axes. Time: 2
  7. 16:56 - Y left finished - Time: 25 minutes
  8. 17:03 - Z back finished - Time - 7 minutes
  9. 17:15 - Y right, Z front done - Time - 12 minutes. Total for all axes outside of X - 44
  10. 17:23 - Y left and Z back axes mounted on frame. Time - 8
  11. 17:29 - Y right, Z front hung on frame - Time - 6
  12. 17:32 - Thermistor and PEI fix - Time - -3
  13. 17:35 - Glue PEI. Time - 13
  14. 17:48 - One heat bed nut was too small on the inside. Got another. -10

BREAK

  1. 18:53 - Nut catcher holes in idler pieces were droopy, reamed out to fit nuts. -2
  2. 18:55 - Z platform start.
  3. 18:58 - Z platform done (without bed attachment still) Time: 3
  4. 19:10 - X axis done. Time: 12 minutes.
  5. 19:15 - Y endstop glued on Y axis. Both endstops inserted into holders and one glued in. 5. Started power supply.
  6. 19:18 - 5 power supply screws came off. 1 was lost. Power supply power cord zip tie loose and below power supply. Power supply cord fixed to the top. Replaced screws. Time: -7
  7. 19:22 - Started control panel. MOSFET dangles forward.
  8. 19:37 - Control panel done. Time: 15
  9. 19:39 - Extruder sensor did not fit in extruder sensor holder. Reamed. Time: -1
  10. 20:10 - Extruder finished - Time: 32
  11. 20:21 - X axis mounted - Time: 11

Tips and Tricks

  1. To level print bed for mounting - press down all the way until the bed mounting idlers both rest on the frame - thereby using the frame to determine a perfect parallel to the ground.

Issues Log

  1. 2 top half circles of carriage pieces all had extra plastic on them. Needed cleaning.
  2. Thermistor head was on top face, not in hole:

edit

Evaluation

Overall kit evaluation is this based on Kit Certification#Evaluation

Sara Comments and Improvements