Universal Axis Applications: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:
*1000s of times every day
*1000s of times every day
*6 month time between maintenane
*6 month time between maintenane
*Design
=Design=
*Open source, transparent design. Someone on board to make good design choices.
*Weight and geometry of effector. Requirement. Cost and performance spec. $800 for just the gantry part.
*Phase 1 - CAD model + BOM - specify the full BOM
*Phase 2 - Visit for production. Show up and build it.

Revision as of 20:20, 10 January 2019

  • Has workshop in Shenzhen - EDM + cnc
  • 120 cm longest axis
  • API -
  • 1000s of times every day
  • 6 month time between maintenane
  • Design

Design

  • Open source, transparent design. Someone on board to make good design choices.
  • Weight and geometry of effector. Requirement. Cost and performance spec. $800 for just the gantry part.
  • Phase 1 - CAD model + BOM - specify the full BOM
  • Phase 2 - Visit for production. Show up and build it.