Cordless Drill Incentive Challenge Design: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*Rewqrd X for non-native FreeCAD CAD, 1.2 to 2 x for FreeCAD native format *Production Engineering is included in settings and platform layout; nesting is considered for produ...") |
No edit summary |
||
Line 1: | Line 1: | ||
=Governance= | |||
*Make the project so large that it is simply impossible without broad collaboration of at least 100 human years, allowing for 10% efficiency typical of peer development, so 10 human years of full time effort (about $1M value at $100k/pop) | |||
*Rewqrd X for non-native FreeCAD CAD, 1.2 to 2 x for FreeCAD native format | *Rewqrd X for non-native FreeCAD CAD, 1.2 to 2 x for FreeCAD native format | ||
*Production Engineering is included in settings and platform layout; nesting is considered for production optimization | *Production Engineering is included in settings and platform layout; nesting is considered for production optimization | ||
*Bonus for self-packaging parts kit? | *Bonus for self-packaging-print parts kit on the production engineering side? | ||
*Produced on OSHWA-certified hardware for non-ambiguity | *Produced on OSHWA-certified hardware for non-ambiguity |
Revision as of 19:01, 18 January 2019
Governance
- Make the project so large that it is simply impossible without broad collaboration of at least 100 human years, allowing for 10% efficiency typical of peer development, so 10 human years of full time effort (about $1M value at $100k/pop)
- Rewqrd X for non-native FreeCAD CAD, 1.2 to 2 x for FreeCAD native format
- Production Engineering is included in settings and platform layout; nesting is considered for production optimization
- Bonus for self-packaging-print parts kit on the production engineering side?
- Produced on OSHWA-certified hardware for non-ambiguity