CEB Floor: Difference between revisions
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
Final structure with CEB floor: | Final structure with CEB floor: | ||
[[Image:mhreal1.jpg| | [[Image:mhreal1.jpg|400px]] | ||
In Microhouse 1, we used unstabilized CEBs. We had a couple of water leaks and the CEB floor degraded, so we retrofitted a wood floor. In the humid Missouri climate, we have seen mold issues because Microhouse 1 was not air conditioned. | In Microhouse 1, we used unstabilized CEBs. We had a couple of water leaks and the CEB floor degraded, so we retrofitted a wood floor. In the humid Missouri climate, we have seen mold issues because Microhouse 1 was not air conditioned. |
Revision as of 15:35, 12 July 2019
Seed Eco-Home 2016
Microhouse 1 2013
Final structure with CEB floor:
In Microhouse 1, we used unstabilized CEBs. We had a couple of water leaks and the CEB floor degraded, so we retrofitted a wood floor. In the humid Missouri climate, we have seen mold issues because Microhouse 1 was not air conditioned.