Line 25: Line 25:
*Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built.
*Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built.
*Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs.
*Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs.
=Links=
*[[Grid Connection Costs]]

Revision as of 02:08, 11 October 2019

2019

Power

Connecting Faculty House and Seed Eco-Home to 200A and 100A service.

edit

Internet

edit

Notes:

  • DSL internet from Centurytel has been discontinued as of late 2018 due to its top speed of only 4 Mbps

2014 Grid, Water, Internet

2013 Water + DSL

Notes:

  • Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built.
  • Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs.