CEB Press/Manufacturing Instructions/Frame with main cylinder: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(No difference)

Revision as of 22:03, 17 April 2011

Tools Required

  • torch
  • hole punch

Materials Required

Channel.jpg
  • 6 inch heavy (7/16") u-channel - ( 20 ft )
  • bolts


Diagrams

Feflibframe.jpg

Fabrication Steps

Step 2
Step 3

1. Torch or cold-cut channel to size

  • 2 pices, 40 3/4"
  • 4 pieces, 18"
  • 2 pieces, 26"

2. Punch holes

3. bolt together

4. Prepare Hydraulic Cylinder

5.